Laserfiche WebLink
<br />C932 <br /> <br />. <br /> <br /> <br />. <br /> <br />Clear Creek Reservoir <br /> <br />This reservoir is the property of the Pueblo Boord of Woter <br />Works but soon will be acquired by the Fryingpan-Arkonsas <br />project. In this picture, storage has been reduced fo facilifate <br />repairs to the outlet works. Port of the water from this <br />reservoir has been stored by exchange in Turquoise lake. <br /> <br />On September 30, 1970, there was 37,717 acre-feet of water in Turquoise <br />Lake as follows: CF&I Steel Corporation, 15,513 acre-feet; Homestake <br />project, 7,391 acre-feet; High Line Canal Comp1my, 2,087 acre-feet; <br />Pueblo Water B01Ud, 2,779 acre-feet; and the Fryingpan-Arkansas project, <br />9, 947 acre-feet. <br /> <br />Table 2 and exhibit 4 show the actual operation of Turquoise Lake for water <br />year 1970. <br /> <br />. <br /> <br />7 <br />