My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05314
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05314
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:17:49 PM
Creation date
10/12/2006 12:57:46 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
5000.375
Description
Flood Protection Section - Alamosa - Rio Grande Flood
State
CO
Basin
Rio Grande
Water Division
3
Date
10/31/1985
Author
Muller Engineering C
Title
Reconnaissance Report - Rio Grande Levee System at Alamosa - Prepared for City of Alamosa and Alamosa County - In Cooperation with CWCB
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />001821 <br /> <br />TABLE 5 <br /> <br />Rio Grande at Alamosa <br />Summary of Unit Construction Costs <br /> <br />Item <br /> <br />Units <br /> <br />Unit Cost <br /> <br />C.Y. <br /> <br />$ 2.00 <br />5.00 <br />40.00 <br />40.00 <br />$3,000.00 <br />3.00 <br />9.00 <br />25.00% <br />15.00% <br /> <br />Levee Excavation <br />Levee Embankment <br />Revetment (Rip Rap) <br />Seepage Control <br />Clearing and Excavation <br />Sandbar Excavation <br />Fencing <br />Construction Contingencies <br />Design & Construction Engineering <br /> <br />C.Y. <br />C.Y. <br /> <br />L.F. <br />ACRE <br />C.Y. <br /> <br />L.F. <br />Percent <br />Percent <br /> <br />Total Project Costs <br /> <br />An oplnlon of the total estimated costs for construction of <br />improvements to the levee system are shown in Table 7. The costs are <br />illustrated for each section of river and for each of the improvements <br />descri bed in the report. Seepage control costs are broken out <br />separately and are subject to further study. Total estimated cost of <br />the improvements is approximately $4.0 million, with the Alternate 'B' <br />alignment for the south tieback levee. The annualized cost of <br />const ruct ion is $338,198, based upon a 50-year 1 He and an 8.25% <br />di scount rate. Recall i ng the annua 1 benefi t estimated earl i er, the <br />project represents a benefit/cost ratio of approximately 2.9. <br /> <br />The cost estimates represent a best opinion of the anticipated costs <br />based upon the 1 imited knowledge of the levee system. Further study <br />and des i gn shoul d follow thi s reconnai ssance study effort. Final <br />des i gn wi 11 make every effort to achi eve economi es in the use of <br />materi a 1 s and means of const ruct i on, to try and mi ni mi ze the total <br />cost of construction and the life cycle costs of the levee system. <br /> <br />-29- <br />
The URL can be used to link to this page
Your browser does not support the video tag.