My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05313
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05313
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:17:49 PM
Creation date
10/12/2006 12:57:37 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.766
Description
Gunnison River General
State
CO
Basin
Gunnison
Water Division
4
Date
3/1/1991
Author
BLM
Title
Gunnison Resource Area - Resource Management Plan and Environmental Impact Statement - Draft - Beginning to Chapter 3
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />7' J.'"'' 0 <br />,) '."....;.J,) <br /> <br />COMPARISON OF ALTERNATIVES <br /> <br />Table S-l (Continued) <br /> <br />SUMMARIZED COMPARISON OF THE MANAGEMENT ALTERNATIVES <br /> <br />RE- <br />SOURCE/ <br />RE- <br />SOURCE <br />USE <br /> <br />MANAGEMENT UNDER EACH ALTERNATIVE <br /> <br />ALTERNATIVE A <br />(Continnation of <br />Current <br />Management) <br /> <br />ALTERNATIVE B <br /> <br />ALTERNATIVE C <br /> <br />ALTERNATIVE D <br /> <br />ALTERNATIVE E <br />(Preferred <br />Alternative) <br /> <br />PORES!" <br />MANAGE- <br />MEN!' <br />(Onsustained <br />yield basis) <br /> <br />About 44,062 acres of <br />suitable commercial forest <br />lands and 19,262 acres of <br />suitable woodlands would <br />be available for harvest, <br />resulting in 8 possible <br />annual harvest of 1,200 <br />MBP of commercial <br />timber; 400 cords of <br />Cuclwood. 0\00 wilding,;, <br />and several hundred <br />Christmas trees; 50 acres <br />of site preparation and SO <br />acres of reforestation <br />completed annually. <br /> <br />One PMP would <br />written. <br /> <br />Seasonal restrictions apply <br />in elk calving areas; <br />harvest in riparian areas <br />restricted or excluded on 8 <br />case-by case basis. <br /> <br />About 39,442 acres of About 58,959 acres of <br />suitable commercial forest suitable commercial forest <br />lands and 24,405 aeres of lands and 19,262 acres of <br />liuitable woodlands would suitable woodlands would <br />be available for hacvcst, be available for harvest, <br />resulting in a possible resulting in a possible <br />annual harvest of 1,180 annual harvest of 1,770 <br />MBP at commercial MBP of commercial <br />timber, SOS cords of timber, approximately 400 <br />ruelwood~ 2SO acres of cords of fuelwood, and <br />reforestation completed several hundred wildings <br />annually. Other forest and Christmas trees. <br />products (wildings, Christ- <br />mas trees) would be avail- <br />able. <br /> <br />About 34,679 acres of <br />suitable commercial forest <br />lands and 27,352 acres of <br />suitable woodlands would <br />be available for harvest <br />resulting in a possible <br />annual harvest of 1,040 <br />MOP of commercial <br />timber. S6S cords of <br />fuelwood, and several <br />hundred wildings and <br />Otristmas trees would be <br />available annually. 500 <br />acres of reforestation <br />would be accomplished in <br />unit D.21. <br /> <br />About 41,347 acres of <br />suitable commercial forest <br />lands and 23,615 acres of <br />suitable woodlands would <br />be available for harvest, <br />resulting in a possible <br />annual harvest oC 1,200 <br />MOP ot commercial <br />timber. 490 cords of <br />fuelwood and several <br />hundred wildings and <br />Christmas trees would be <br />available annually. <br />ReCorestation would be <br />accomplished as funds be- <br />come available. <br /> <br />Timber harvests would be <br />designed to be compatible <br />with these alternative <br />objectives. <br /> <br />be One FMP would <br />prepared, <br /> <br />be <br /> <br />be One FMP would <br />written. <br /> <br />be <br /> <br />limber harvests would be <br />designed to be compatible <br />with these alternative <br />objectives. <br /> <br />Harvest restrictions (total <br />exclusions, design require- <br />ments or seasonal <br />restrictions) apply in <br />riparian zones, existing <br />WSAs, Slumgullion <br />Earthflow, erosive soils, <br />crucial big game winter <br />range, elk calving areas, <br />within SRMAs, or Cor <br />nongame wildlife habitat <br />and other recreation <br />resources. <br /> <br />Restrictions apply on <br />crucial elk and deer winter <br />range (seasonal) and elk <br />calving areas (seasonal <br />and leave areas). <br /> <br />One FMP would <br />prepared, <br /> <br />Harvest or design re- <br />strictions apply in riparian <br />zones, Slumgullion slide, <br />erosive soils, crucial big <br />game winter range, within <br />SRMAs, or for nongame <br />wildlife habitat and other <br />recreation leSOUTces <br />(harvest restrictions are <br />seasonal or exclusion). <br /> <br />S-13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.