My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05301
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05301
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:17:45 PM
Creation date
10/12/2006 12:57:20 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.106
Description
Animas-La Plata
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
10/1/1992
Title
Animas-La Plata Participating Project
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Coosttuction <br /> <br />.................................................................................................................................................................... Animas-La Plata <br /> <br />Allocation <br /> <br />Project Cost Allocation <br />IT 1m Estimate <br /> <br />IT 1993 EstUnate <br /> <br />[rrlgation <br />Municipal & lndustrialll <br />Recreation <br />FISh and Wildlife <br />Other 7J <br />Total <br /> <br />$455,767,000 <br />104,631,000 <br />11,200,000 <br />18,743,000 <br />21.000.000 <br />5611,341,000 <br /> <br />$477.924,000 <br />109,934,000 <br />11,500,000 <br />19,596,000 <br />21.800.000 <br />5640,754,000 <br /> <br />11 Includes 523,339.000 reimbun;able interest during COIlSlIUCtion based on the current Coletado River Storage Project <br />interest rate. <br /> <br />y Nonreimbun;able cu1turallCSOurces activities. <br /> <br />Cost Allocation <br />Methodology: <br /> <br />The methodology of the cost allocation has not been modified from last year. The increases <br />in total costs includes cost indexing from October 1991 to October 1992 for an additional <br />528,560,000 and interest during construction of 5853,000 for a total increase of 529,413,000. <br />All allocations increased due to the inCte3SC in total cost. <br /> <br />189 <br />
The URL can be used to link to this page
Your browser does not support the video tag.