Laserfiche WebLink
<br />4. <br /> <br />4. Operators of non-federal-project irrigation works are <br />obliged to accept the changes in the characteristics of <br />Missouri River flows of water brought about by existence <br />of Corps reservoirs, whether incidentally or individually <br />advantageous or detrimental to such operators, since <br />such non-federal-project irrigation may not interfere <br />with the accomplishment of the Congressionally authorized <br />federal purposes. <br />