My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05278
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05278
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:17:39 PM
Creation date
10/12/2006 12:56:55 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.760
Description
Yampa River General
State
CO
Basin
Yampa/White
Water Division
6
Date
7/31/1990
Author
Hydrosphere
Title
Yampa River Basin - Alternatives Feasibility Study - Plan of Study
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />002595 <br /> <br />Plan of Study <br />SUB- TASK 3c: SELECt' CANDIDATE SITES <br /> <br />27 <br /> <br />Purpose <br /> <br />The objective of this screening exercise will be to reduce the number of sites requiring <br />detailed field reconnaissance to 6 - 8 sites, including Elkhead Reservoir and Ralph White <br />Reservoirs. <br /> <br />Approach <br /> <br />1) The findings of Sub-task 3b will be summarized for each site, as described previously, and <br />a subjective comparison will be made between sites. This comparison will utilize a systematic <br />approach, such as an evaluation matrix, but will necessarily involve a good deal of <br />professional judgment. The site summaries and results of the site comparisons, along with <br />recommendations as to which sites to retain in the study process, will be compiled into a <br />draft technical memorandum and provided to the TSC for review prior to a formal screening <br />meeting. <br /> <br />2) The TSC will meet to select up to six sites for consideration in Task 5. Ralph White <br />Reservoir and Elkhead Reservoir have already been identified as candidate sites so the total <br />number of candidate sites may be up to eight. An additional two new potential sites may be <br />subjected to a fatal flaw analysis in Sub-task 5a. The selected sites will be presented to the <br />PAG at a subsequent meeting in the basin. <br /> <br />Output <br /> <br />The product of this sub-task will be a Task 3 Technlcal Memorandum containlng the list of up <br />to six candidate ~ites selected for further analysis, supporting technlcal documentation for <br />each site, and a summary of the methods and criteria used in selection of final candidate <br />sites. <br />
The URL can be used to link to this page
Your browser does not support the video tag.