Laserfiche WebLink
<br />I. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />002594 <br /> <br />Plan of Study <br /> <br />26 <br /> <br />6) Water RightS Issues-The suitability of the site for the long-term reservation of a portion of <br />the Juniper-Cross Mountain water rights is an important criteria for the long-term reservoir <br />site. Sites will be evaluated based on the extent to which each site is technically defensible, <br />from a malntenance-of.diligence perspective, and provides flexibility for future transfer or <br />subordination of water rights. <br /> <br />Output <br /> <br />The products of this sub-task will include a summary table briefly describing the attributes of <br />each site; a data sheet for each site describing its characteristics in somewhat more detail and <br />in a common format; a package of technical material for each site including maps, listings of <br />previous site studies, site hydrologic parameters and reservoir volume calculations; and a <br />summary of the sites which were not included in the site inventory including a brief <br />explanation, for each excluded site, of the factors which were considered significant in its <br />exclusion. <br />