My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05278
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05278
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:17:39 PM
Creation date
10/12/2006 12:56:55 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.760
Description
Yampa River General
State
CO
Basin
Yampa/White
Water Division
6
Date
7/31/1990
Author
Hydrosphere
Title
Yampa River Basin - Alternatives Feasibility Study - Plan of Study
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />.002584 <br />Plan of Study <br /> <br />16 <br /> <br />SUB-TASK fa: Establish Studv Protocols and Schedules <br /> <br />l'urpoIle <br /> <br />The purpose of this sub-task is to clearly identify and define the roles of the TSC and PAG, <br />the official contact persons at various participating agencies, the procedures to be followed <br />in contacting agencies and individuals for information and in distributing study information <br />to agencies and individuals, and the desired format of various study documents and <br />correspondence. Definition of these protocols will help to ensure that study information is <br />provided to the right people at the right time and that confusion and delay stemming from <br />missed or misdirected communications are avoided. <br /> <br />A related purpose of this sub-task is to develop a preliminary schedule for subsequent TSC <br />and PAG meetings. A proposed schedule for all study tasks and meetings has been Included <br />In this Plan of Study. It is expected that TSC meetings will be more frequent than PAG <br />meetings since the TSC will have to address more detailed study issues and assumptions. A <br />TSC meeting will be scheduled no less than two weeks prior to each PAG meeting to discuss <br />the materials to be presented at the following PAG meeting. <br /> <br />Approach <br /> <br />The definition of study protocols and schedules would be accomplished at the first TSC <br />meeting. Protocols will include clear explication of the roles of the TSC and PAG, names and <br />mailing addresses of official contacts at participating agencies, and procedures for circulation <br />of Information. These protocols and schedules will also be presented at the first PAG <br />meeting to be held In Craig. This PAG meeting will serve as a "kickoff' public meeting for the <br />study. <br /> <br />Output <br /> <br />The product of this sub-task will be a Task 1 Technical Memorandum outlining study <br />protocols and containing mailing lists and a preliminary schedule ofTSC and PAG meetings. <br />
The URL can be used to link to this page
Your browser does not support the video tag.