My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05278
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05278
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:17:39 PM
Creation date
10/12/2006 12:56:55 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.760
Description
Yampa River General
State
CO
Basin
Yampa/White
Water Division
6
Date
7/31/1990
Author
Hydrosphere
Title
Yampa River Basin - Alternatives Feasibility Study - Plan of Study
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />002578 <br /> <br />Plan of Study <br />STUDYPRODUcrs <br /> <br />9 <br /> <br />The study team will provide 10 Task Technical Memoranda during the course of the study. <br />These memoranda will summarize and explain the work that has been completed for the <br />task(s) at that point In time. They will also document any conclusions that have been <br />reached. Memoranda exceeding 20 pages In length will contain an executive summary. <br /> <br />Prior to completion of the study, the study team shall prepare a comprehensive draft <br />technical report which describes the study process, the Infonnation gathered, and the <br />analyses perfonned during the course of the study. After review and approval, the study <br />team shall make any necessary revisions to the draft report and submit one camera-ready <br />original and 50 copies of the technical report to the District. <br /> <br />In parallel with the technical report, the study team shall also prepare a draft summary report <br />of about 50 pages and submit It to the District for review. Once this report has been <br />reviewed and revised, the study team shall provide the District with one camera-ready copy <br />and 100 copies of the summary report. The Task Technical Memoranda, Summary Report <br />and Technical Report will be prepared In a fonnat and style consistent with accepted <br />standards of professional technical writing. <br /> <br />Table 3 presents an estimated allocation of labor and budget for the study. <br /> <br />I. <br /> <br />; ." <br />::h~ ,.J,i?- <br />
The URL can be used to link to this page
Your browser does not support the video tag.