Laserfiche WebLink
<br />48-S0UTH PLATTE RIVER BASIN COOPERATIVE STUDY, COLORADO <br />USDA/Soil Conservation Service <br />Irrigation, M&I and Rural Supply, Land Conserv. & Mgmt. <br /> <br />Proposed FY 81 new start regional study of irrig. <br />water mgmt., rural water supply, and erosion in <br />the S. Platte Basin; SCS, FS and ESCS effort <br />scheduled FY 81-84; total cost $850,000. <br /> <br />................................................................................................................... <br /> <br />49-FARWELL UNIT WATER CONSERVATION STUDY, NEBRASKA <br />OOlfWater and Power Resources Service <br />Irrigation, Water Quality, Land Conserve & Mgmt. <br /> <br />FY 80 new start study of water use and rising <br />ground water table prOblems in Nebraska's Middle <br />Loup River Basin; total funding requirement is <br />$350,000 for FY 80-82. <br /> <br />........................................................................................................................ <br /> <br />50-NARROWS UNIT, COLORADO <br />DOI/Water and Power Resources Service <br />Irrigation, Recreation, Flooding, F&W, Transportation <br /> <br />Authorized project for irrigating 287,000 acres in <br />s. Platte Basin; construction funds deferred pending <br />alternatives analysis in FY 80: total project <br />cost is $169 million. <br /> <br />................................................................................................................... <br /> <br />..... <br />I <br />~ <br />co <br /> <br />51-NORTH LOllP DIVISION, NEBRASKA <br />DOI/Water and Power Resources Service <br />Irrigation, Recreation; Nat., Hist. & Cult., Reo., F&W <br /> <br />Ongoing construction of project to irrigate 53,000 <br />acres in central Neb.; completion scheduled post- <br />FY 85; total cost estimated to be $160 million. <br /> <br />................................................................................................................... <br /> <br />52-{)'NEILL UNIT, NEBRASKA <br />OOlfWater and Power Resources Service <br />Irrig.; F&W: Recreation; Nat., Hist., & Cult.: Flooding <br /> <br />Ongoing project for irrigation of 77,000 acres in <br />north-central Neb.: construction is enjoined <br />pending supplementing the ES; includes Norden Dam on <br />Niobrara R; cost estimated to be $226 million. <br /> <br />................................................................................................................... <br /> <br />53-NORTH PLATTE PROJECT, REHAB. AND BETTERMENT, NEB. & WYO. <br />DOI/Water and Power Resources Service <br />Irrigation, Fish & Wildlife <br /> <br />Ongoing special study of the Guernsey Res. siltrun <br />and alternatives for im~ovin9 irrigation effi- <br />ciency on N. Platte project systems; study cost <br />estimated at $936,000 through FY 83. <br /> <br />................................................................................................................... <br /> <br />54-PRAIRIE BEND UNIT FEASIBILITY STUDY, NEBRASKA <br />DOI/Water and Power Resources Service <br />Irrigation, Fish & Wildlife, Water Quality, Instream Flows <br /> <br />Proposed feasibility study to begin in FY 82 for <br />irrigation project on 70,000 acres in central <br />Platte River area; will include study of conjunc- <br />tion use and wildlife habitat; cost $1.6 million. <br /> <br />...... .-............................................................................................................ <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br />