My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05255
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05255
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:17:33 PM
Creation date
10/12/2006 12:56:05 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407.500
Description
Platte River Basin - River Basin General Publications - Missouri River
State
CO
Basin
South Platte
Water Division
1
Date
5/1/1980
Author
MRBC
Title
Missouri River Basin Water Resources Management Plan - Part II - Chapters VII-Appendix F
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />42-GERING VALLEY WATERSHED PROJECT, NEBRASKA <br />USDA/Soil Conservation Service <br />Flooding <br /> <br />Project under construction; completion scheduled <br />FY 86; located in Scotts Bluff County; includes <br />9 flood retention structures; 22 miles of channel; <br />cost is $6.7 million. <br /> <br />c:I <br />d <br />ClI! <br />*"" <br />-' <br />c,.;) <br /> <br />........................................................'............................................................ <br /> <br />43-oAK/MIDDLE & NORTH OAK WATERSHED PROJECT, NEBRASKA <br />USDA/Soil Conservation Service <br />Flooding, Land Cons. & Mgmt., Recreation <br /> <br />Project under construction; completion scheduled <br />FY 84; located in upper Salt Creek Basin; <br />includes 9 flood retention structures; 22 miles <br />of channel; cost is $6.7 million. <br /> <br />..................................................................................................................... <br /> <br />44-SPRING CREEK (DAWSON COUNTY) WATERSHED PROJECT, NEBRASKA <br />USDA/Soil Conservation Service <br />Flooding <br /> <br />Project under construction; completion scheduled <br />FY 81; located in Dawson and Custer counties; <br />includes 6 flood retention structures; cost is <br />estimated at $2.7 million. <br /> <br />................................................................................................................... <br /> <br />.... <br />I <br />.... <br />.... <br /> <br />45-WINTER'S CREEK WATERSHED PROJECT, NEBRASKA <br />USDA/Soil Conservation Service <br />Flooding <br /> <br />Project under construction; completion scheduled <br />FY 80; located in western Neb, in N. Platte Basin; <br />includes 1 flood retention structure; 7.2 miles of <br />channel; cost estimated at $4 million. <br /> <br />................................................................................................................... <br /> <br />46-SPRING CANYON WATERSHED PROJECT, WYOMING <br />USDA/Soil Conservation Service <br />Flooding, and Land Conservation and Management <br /> <br />Project under construction; completion scheduled <br />~Y 82; located in Goshen County, N. Platte Basin; <br />includes one flood retention structure, pipeline, <br />and land treatment; cost is $1.1 million. <br /> <br />................................................................................................................... <br /> <br />FISB'ARD WILDLIFE <br /> <br />IRRIGATION <br /> <br />47-COOPERATIVE IRRIGATION WATER CONSERVATION STUDY, WYOMING <br />USDA/Soil Conservation Service <br />Irrigation <br />Also in Yellowstone and Western Dakotas Subbasins <br /> <br />FY 80 new start special study of irrigation water <br />conservation throughout Wyoming; scheduled for <br />effort by SCS, FS, and ESCS through FY 85; total <br />cost $1.1 million. <br /> <br />................................................................................................................... <br />
The URL can be used to link to this page
Your browser does not support the video tag.