My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05236
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05236
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:17:29 PM
Creation date
10/12/2006 12:55:23 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.106
Description
Animas-La Plata
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
2/26/1996
Title
Final Biological Opinion - 1996
Water Supply Pro - Doc Type
Biological Opinion
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />r <br /> <br />Shiprock, and Bluff for 6 representative years illustrate the changes <br />in flow between these two modeling efforts and also include all of <br />the depletion changes in the basin (Figures 1-18). <br /> <br />3. Delivered when Navajo Storage Over 660,000 AF <br /> <br />When the storage in Navajo Reservoir drops below 660,000 AF, the <br />Reservoir cannot deliver water into the Navajo Indian Irrigation <br />Project. The computer model used in this analysis did not release <br />the 300,000 AF for the endangered fish when it would cause the <br />storage in Navajo Reservoir to drop below 660,000 AF. For the <br />current level of depletion (including the reasonable and prudent <br />alternative to the Animas-La Plata Project), this cut-off target does <br />not affect the number of years that the release for endangered fish <br />is made. <br /> <br />If and when the level of depletions increases (through future project <br />depletions), some balancing of benefits will be required. lowering <br />the level at which releases are discontinued will allow the release <br />of water for endangered fish in more years, but the Reservoir will <br />spill less frequently resulting in a sharper "spike" in the <br />hydrograph. Keeping this target level will preserve the gravity <br />diversion for Navajo Indian Irrigation Project and preserve a more <br />"natural" shape of the hydrograph, but wi 11 reduce the number of <br />years that releases can be made. <br /> <br />D. Stage A at 57,100 AF <br /> <br />Stage A as presented to the Service by Reclamation includes the <br />construction of Ridges Basin Reservoir, the inlet pipeline, the Durango <br />Pumping Plant, a smaller Ridges Basin Pumping Plant, the Shenandoah and <br />La Plata rural, and the Durango M&I pipelines. These facilities <br />represent the only delivery system associated with the depletion of <br />57,100 AF that will be built under the reasonable and prudent <br />alternative. <br /> <br />E. Interim Operation of Stage A <br /> <br />When Ridges Basin Reservoir reaches approximately 168,00 AF capacity the <br />system would be declared operational. M&I water could be immediately <br />delivered to New Mexico and the city of Durango, and through the La Plata <br />Rural and Shenandoah Pipelines. <br /> <br />New Mexico's San Juan Water Commission water supply would be picked up <br />using existing diversions on the Animas and San Juan Rivers. Similarly, <br />the Navajo water supply could be delivered from the San Juan River at <br />existing diversions near the town of Shiprock, New Mexico. Most of this <br />supply for New Mexico would come from the direct flows from the River. <br />An average of only 1,400 AF yearly (9,000 to 0 acre-feet range) would be <br />supplied from the Reservoir, down Basin Creek and to the San Juan River <br />via the Animas River. <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.