My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05223
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05223
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:17:27 PM
Creation date
10/12/2006 12:54:54 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.40
Description
CRSP
Basin
Colorado Mainstem
Date
6/30/1979
Author
USDOI
Title
23rd Annual Report on the Statuts of the Colorado River Storage Project
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Salinity Control Activities <br /> <br /> <br />Progress toward construction continued <br />on the Paradox Valley and Grand Valley <br />Units, Colorado. Work on the Las Vegas <br />Wash Unit, Nevada, has been suspended <br />pending reformulation of the Salinity Con. <br />trol Plan. These units were authorized by <br />the Colorado River Basin Salinity Control <br />Act (P.L. 93.320, June 24, 1974). <br /> <br />Work on the Paradox Unit included the in- <br />stallation of pumps in previously drilled <br />wells and an extension of power lines to <br />provide power to the wells. The well field <br />is being tested to determine the pumping <br />rate that will stop the flow of brine into <br />the Dolores river. The final Environmental <br />Impact Statement was filed with Environ. <br />mental Protection Agency on March 20, <br />1979. <br /> <br />A Special Report was prepared for the <br />Stage I area of the Grand Valley Unit for <br />submittal to Congress. A monitoring plan <br />was devised to measure the effects of <br />Stage I construction in reducing salinity. <br />The five-year trial period or Irrigation <br />Management Services ended and the pro- <br />gram was terminated on the Grand Valley <br />Unit. <br /> <br /> <br />Enjoying good clean water <br /> <br />Feasibility studies continued on 13 other <br />units authorized for investigation. In the <br />Upper Colorado River Basin, planning ac. <br />tivities were concentrated on the Meeker <br />Dome, Lower Gunnison, Uinta Basin, Big <br />Sandy and McElmo Creek Units. Stream <br />flow and water quality data collection con- <br />tinued on the Glenwood.Dotsero Springs, <br />Price.San Rafael and Oirty Devil Units. <br /> <br />A first-of-its-kind contract was awarded for <br />professional services to a consulting firm <br />to study methods of reducing saline flows <br />into the White River from the Meeker <br />Dome Unit. The contractor completed a <br />Problem Identification and Quantification <br />Report which identified unplugged oil and <br />gas exploratory wells as the sources pro- <br />ducing the saline water. The contractor <br />will collect further data to verify this <br />hypothesis and then plug the leaking <br />wells. <br /> <br /> <br />Salinity control <br /> <br />A public involvement program was organ- <br />ized for the Meeker Dome Unif and <br />meefings have been held to keep the <br />public informed and to let the public <br />assist in selecting the best plan for con- <br />struction. Test pumping was performed on <br />the 72 wells on the Big Sandy River Unit <br />to identify salinity mechanisms producing <br />the saline water. Eighteen additional wells <br />will be test-pumped this year. <br /> <br />Planning activities in the Lower Colorado <br />River Basin were continued on the Laver- <br />kin Springs Unit including studying pre. <br />treatment processes, for desalting or <br />using the saline water for industrial <br />purposes. <br /> <br />7 <br />