<br />Vat Tunnel. Bonneville Unit
<br />
<br />A contract for roads, buildings, and util-
<br />ities, Soldier Creek and Aspen Grove
<br />Campgrounds, Bonneville Unit, Central
<br />Utah Project, was awarded for $2,520,509
<br />on September 27, 1979. Work on this con-
<br />tract will start in the spring of 1980.
<br />
<br />
<br />Ridgway Dam construction
<br />
<br />On the Lyman Project, Utah-Wyoming,
<br />Stateline Dam, the dam embankment was
<br />completed in late annual year 1978. In May
<br />of 1979 reservoir filling was started with
<br />24 percent of the reservoir filled by the
<br />end of the fiscal year.
<br />
<br />Estimated Construction Costs of Colorado River Storage Project
<br />and Participating Projects
<br />
<br />Other Cost Changes
<br />
<br />(Changes in Plan, Reanalysis of Quantities and Unit
<br />Prices, Legislative Additions, Unforeseen Conditions,
<br />etc.)
<br />
<br />Cost Increases Due To Inflation
<br />
<br />Subsequent New Authorizations
<br />
<br />/1962: Navajo Indian Irrigation Project, San Juan-
<br />Chama
<br />1965: Bostwick Park, Fruitland Mesa, Savery-Pot Hook
<br />1968: Animas-LaPlata, Dallas Creek, Dolores, San
<br />Miguel, West Divide, Uintah Unit-CUP
<br />
<br />~ Initial Authorizations' (1956)
<br />
<br />Stora. ge Units: Curecanti Flaming GO. rge,. Glen C. a.
<br />nyon, Navajo
<br />Participating Projects: Florida, Paoma, Slit, Smith
<br />Fork, Hammond, Central Utah, Emery County, Lyman,
<br />Seedskadee, La Barge', Pine River Extension'
<br />
<br />Billions
<br />of
<br />Dollars
<br />3.5
<br />
<br />
<br />3.0
<br />
<br />2.5
<br />
<br />2.0
<br />
<br />1.5
<br />
<br />1.0
<br />
<br />.5
<br />
<br />o
<br />
<br />'Only $760 Million was initially appropriated by Congress
<br />'Deferred indefiniteiy in 1962
<br />'Deauthorized in 1971
<br />
<br />(Section 5 and Section 8 Facilities)
<br />with increases from 1956 (Initial) to
<br />September 1979 (Estimated)
<br />
<br />Additional Section 8 Costs
<br />
<br />
<br />
<br />Soldier Creek Campground.
<br />
<br />Bids for a contract for the construction of
<br />Ridgway Dam, Stage 1, Dallas Creek Proj-
<br />ect, were opened September 27, 1979. The
<br />low bid was $14,997,765. Anticipated com.
<br />pletion date is November 5, 1981. Work
<br />will start the first of annual year 1980.
<br />
<br />On the Dolores Project, Colorado, a con.
<br />tract for construction of the Dolores Field
<br />Station was awarded in February 1979 for
<br />$175,535. All work was complete on Sep.
<br />tember 10, 1979.
<br />
<br />On Juiy 20, 1979, a contract for the
<br />Dolores District Headquarters was
<br />awarded for $526,400.00. By the end of the
<br />year 18 percent of the work had been com-
<br />pieted with the contractor earning $93,885.
<br />
<br />These two contracts are preparing for
<br />office requirements needed for the con-
<br />struction of the McPhee Oam.
<br />
<br />On the Flaming Gorge Unit of the Colo-
<br />rado River Storage Project, an award for
<br />the Dutch John Water System Enlarge-
<br />ment was made on September 25, 1979.
<br />The low bid was $1,357,725.
<br />
<br />A contract was awarded in the amount of
<br />$587,032.50 on September 28, 1979, for a
<br />Sanitary Landfill Access Road, Page,
<br />Arizona, on the Glen Canyon Unit of the
<br />Colorado River Storage Project
<br />
<br />5