<br /> <br />Vat Tunnel. Bonneville Unit <br /> <br />A contract for roads, buildings, and util- <br />ities, Soldier Creek and Aspen Grove <br />Campgrounds, Bonneville Unit, Central <br />Utah Project, was awarded for $2,520,509 <br />on September 27, 1979. Work on this con- <br />tract will start in the spring of 1980. <br /> <br /> <br />Ridgway Dam construction <br /> <br />On the Lyman Project, Utah-Wyoming, <br />Stateline Dam, the dam embankment was <br />completed in late annual year 1978. In May <br />of 1979 reservoir filling was started with <br />24 percent of the reservoir filled by the <br />end of the fiscal year. <br /> <br />Estimated Construction Costs of Colorado River Storage Project <br />and Participating Projects <br /> <br />Other Cost Changes <br /> <br />(Changes in Plan, Reanalysis of Quantities and Unit <br />Prices, Legislative Additions, Unforeseen Conditions, <br />etc.) <br /> <br />Cost Increases Due To Inflation <br /> <br />Subsequent New Authorizations <br /> <br />/1962: Navajo Indian Irrigation Project, San Juan- <br />Chama <br />1965: Bostwick Park, Fruitland Mesa, Savery-Pot Hook <br />1968: Animas-LaPlata, Dallas Creek, Dolores, San <br />Miguel, West Divide, Uintah Unit-CUP <br /> <br />~ Initial Authorizations' (1956) <br /> <br />Stora. ge Units: Curecanti Flaming GO. rge,. Glen C. a. <br />nyon, Navajo <br />Participating Projects: Florida, Paoma, Slit, Smith <br />Fork, Hammond, Central Utah, Emery County, Lyman, <br />Seedskadee, La Barge', Pine River Extension' <br /> <br />Billions <br />of <br />Dollars <br />3.5 <br /> <br /> <br />3.0 <br /> <br />2.5 <br /> <br />2.0 <br /> <br />1.5 <br /> <br />1.0 <br /> <br />.5 <br /> <br />o <br /> <br />'Only $760 Million was initially appropriated by Congress <br />'Deferred indefiniteiy in 1962 <br />'Deauthorized in 1971 <br /> <br />(Section 5 and Section 8 Facilities) <br />with increases from 1956 (Initial) to <br />September 1979 (Estimated) <br /> <br />Additional Section 8 Costs <br /> <br /> <br /> <br />Soldier Creek Campground. <br /> <br />Bids for a contract for the construction of <br />Ridgway Dam, Stage 1, Dallas Creek Proj- <br />ect, were opened September 27, 1979. The <br />low bid was $14,997,765. Anticipated com. <br />pletion date is November 5, 1981. Work <br />will start the first of annual year 1980. <br /> <br />On the Dolores Project, Colorado, a con. <br />tract for construction of the Dolores Field <br />Station was awarded in February 1979 for <br />$175,535. All work was complete on Sep. <br />tember 10, 1979. <br /> <br />On Juiy 20, 1979, a contract for the <br />Dolores District Headquarters was <br />awarded for $526,400.00. By the end of the <br />year 18 percent of the work had been com- <br />pieted with the contractor earning $93,885. <br /> <br />These two contracts are preparing for <br />office requirements needed for the con- <br />struction of the McPhee Oam. <br /> <br />On the Flaming Gorge Unit of the Colo- <br />rado River Storage Project, an award for <br />the Dutch John Water System Enlarge- <br />ment was made on September 25, 1979. <br />The low bid was $1,357,725. <br /> <br />A contract was awarded in the amount of <br />$587,032.50 on September 28, 1979, for a <br />Sanitary Landfill Access Road, Page, <br />Arizona, on the Glen Canyon Unit of the <br />Colorado River Storage Project <br /> <br />5 <br />