<br />Construction Activities <br /> <br /> <br />The Major construction activities of the <br />Upper Colorado Regional office for fiscal <br />year 1979 were in the Bonneville Unit and <br />Jensen Unit of fhe Central Utah Project; <br />the Lyman Project, Utah.Wyoming; and the <br />Dallas Creek Project, Colorado. <br /> <br />During the fiscal year, work continued on <br />the Red Fleet Dam, Jensen Unit, Central <br />Utah Project, topping out the main dam <br />embankment by the end of the fiscal year. <br />Embankment next to the spillway will be <br />completed when remaining spillway con. <br />crete has been placed. The work was 94 <br />percent completed at the year's end, <br />based on new total contract cost. <br /> <br />On the Bonneville Unit, work continued on <br />Vat Tunnel, with a total of 32,043 feet <br />excavated for 74 percent complete at <br />year's end. Work continued on the 8.mile- <br />long Stillwater Tunnel until August 31, <br />1979, when the contract was terminated at <br />the convenience of the Government due to <br />the inability of the tunneling method to <br />complete the work. Work on the Alpine <br />Aqueduct Section 1, Jordan Aqueduct <br />System, Bonneville Unit, Central Utah Proj- <br />ect, continued with completion expected <br />in Oecember 1979. Total contract earnings <br />for the fiscal year were $2,863,633. <br /> <br />4 <br /> <br /> <br />Stillwater Tunnel, Bonneville Unit <br /> <br />Placement of riprap, Soldier Creek Dam, <br />Bonneville Unit, Central Utah Project was <br />completed in August 1979 with contract <br />earnings of $1,188,429. <br /> <br />In April of 1979 an $11,763,892 contract <br />was awarded for the construction of Vat <br />Diversion Dam and West Fork Pipeline, <br />Bonneville Unit, Central Utah Project. By <br /> <br /> <br />Slateline Dam, Lyman Project <br /> <br />year's end, 2,189 feet of 78" concrete pipe <br />had been installed completing 6.1 percent <br />of the contract. <br /> <br />Work continued on the Strawberry and <br />Currant Creek Recreation Roads, Bonne- <br />ville Unit, Central Utah Project (contract <br />value $4,551,318), with 49 percent of the <br />work completed by the end of the year. <br /> <br />Construction CostS. Annual and Accumulated <br /> <br /> Annual Accumulated <br />Fiscal year 1970 $38,517,800 <br />As of 6/30/70 $854,601,345 <br />Fiscal year 1971 30,443,914 <br />As of 6/30/71 885,045,259 <br />Fiscal year 1972 43,187,756 <br />As of 6/30/72 928,233,015 <br />Fiscal year 1973 46,588,918 <br />As of 6/30/73 974,821,933 <br />Fiscal year 1974 36,986,459 <br />As of 6/30/74 1,011,808,392 <br />Fiscal year 1975 52,303,718 <br />As of 6/30/75 1,064,112,110 <br />Fiscal year 1976 70,281,741 <br />As of 6/30/76 1,134,393,851 <br />Transitional quarter and <br />fiscal year 1977 131,750,705 <br />As of 9/30/77 1,266,144,556 <br />Fiscal year 1978 89,001,375 <br />As of 9/30/78 1,355,145,931 <br />Fiscal Year 1979 95,067,380 <br />As of 9/30/79 1,450,213,311 <br />