Laserfiche WebLink
<br /> <br />.- <br />Navajo Dam and Lake <br /> <br />amount was applied to repayment of M&I <br />investments in the participating projects. <br />During the year irrigators paid about <br />$250,000 toward repayment of the Irriga- <br />tion allocatfon. To date, power revenues <br />have paid $92 million_ Municipal and In- <br />dustrial water revenues have paid $6 <br />million and irrigators have paid $2 million. <br />All of this repayment is in addition to <br />operating costs. <br /> <br />Contracts have been executed for 16 of <br />the 24 participating projects; 15 of which <br />are constructed or under construction. The <br />Navajo Indian Irrigation Project is also <br />under construction but a repayment con. <br />tract is not required tor this non.reim. <br />bursable Indian prOject. Of the eight proj- <br />ects on which construction has not yet <br />started, a contract has been executed for <br />one; two are nearing contract execution; <br />four are in the advance planning stage, <br />and one has been postponed indefjnitely_ <br /> <br />In order to provide revenues sufficient to <br />pay annual operating costs of the storage <br />units, provide for replacements, pay in- <br />terest charges, repay costs of the storage <br />units allocated to power, assist in repay- <br />ment of storage unit costs allocated to ir- <br />rigation, pay specified salinity costs, and <br />to provide assistance in repaying the <br /> <br />~{ <br /> <br /> <br />Scenic view of Flaming Gorge <br /> <br />irrigation allocation of authorized par. <br />ticipating projects within the time limits <br />prescribed by law, it is necessary to in- <br />crease the CRSP pOwer selling rate_ <br /> <br />It is proposed to increase the current <br />power rate about 26 percent beginning in <br />October 1980 and to increase that rate <br />approximately 7 percent beginning in Oc- <br />tober 1983_ The proposed fiscal year 1980 <br />rate would be about 37 percent above the <br />original CRSP power rate, which was in ef- <br />fect prior to April 1974. The proposed 1983 <br />rate is about 47 percent above the original <br />rate. These increases are reflected in the <br />exhibit in the envelope On the inside back <br />caver. <br /> <br />The principal reasons for the projected in- <br />crease include the inflationary rise in pres- <br />ent and projected power system operating <br />costs, estimated higher costs to complete <br />construction of the authorized storage <br />units and participating projects facilities <br />including mitigation and environmental <br />Protection costs, the increased cost of <br />purchased energy required to fulfill Con- <br />tract commitments and the increase in the <br />estimated construction and operating <br />costs of four specific authorized Colorado <br />River Saljnity Controi Projects (Public Law <br />93-320, 88 Stat 266)_ <br /> <br /> <br />..., <br /> <br /> <br />Fontenelle Dam and Reservoir <br /> <br />Projections using current estimates of <br />CRSP costs, construction schedules, and <br />revenues from power sales (including the <br />proposed rate increase), municipal and in- <br />dustrial water sales, payments by irri. <br />gators, ad valorem taxes, and miscella- <br />neous revenues show that payment of the <br />reimbursable costs of the authorized Colo- <br />rado River Storage PrOject and par- <br />ticipating prOjects can be accomplished <br />within the authorized repayment periods_ <br /> <br />NOTE: A detailed chart of the Historical <br />and Projected Repayment of Authorized <br />Reimbursable Investment is located in the <br />sleeve of the back COver. <br /> <br />31 <br />