Laserfiche WebLink
<br />3. Reservoir Operation <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />'. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1993 <br /> <br />The planned release from Ruedi Reservoi r : for October through Apri 1 is <br />80 ft3/s which would draw the reservoir down to an elevation of <br />7733.3 feet by March 31, 1990. However, :based upon the type of runoff <br />season indicated by monthly snowpack data, the outflow from the <br />reservoir and the target elevation will be adjusted. To provide <br />maximum flood protect i on be 1 ow the dam, the reservoi r wi 11 be drawn <br />down by March 31,1990, to a point where refilling would be assured <br />during the spring runoff. Estimates of ;probable inflow will be made <br />following the February 1, March 1, April :1, and May 1 snow forecasts. <br />Following this, the drawdown will be adjus~ed accordingly. <br /> <br />West Slope recreation interests requested that the reservoir water level <br />not be drawn down below elevation 7706.0 (53,000 acre-feet), which is <br />2.0 feet above the bottom of the ~orest Service boat ramp. The <br />reservoir would fill by the first of JulY to provide optimum recreational <br />benefits during the sumner months. This request wi 11 be honored until <br />long term contracts can be developed for s~le of storage water. <br /> <br />After July 1, operating plans call for l]1aintaining the reservoir at <br />elevation 7764.0 (2.0 feet below the spillway crest) until August 1. <br />Then, on ly inflow and short term contracted de 1 i veri es will be passed <br />during the month of August. The Colorado Division of Wildlife has <br />requested that the outflow be maintained, at about 100 ft3/s during <br />September to optimize the downstream fishery. These flows will be <br />maintained under normal conditions. If conditions warrant, the outflow <br />during these months may be adjusted to conserve water. <br />, <br /> <br />If water is sold to entities downstream, tne outflow from the reservoir <br />will be adjusted to the situation at the time of delivery and will be <br />included in the overall operation. : <br /> <br />Table 13 and exhibit 21 show the anticipated operation of Ruedi <br />Reservoir during water year 1990. <br /> <br />C. West Slope Collection System <br /> <br />" <br />In 1990, there will be 16 diversion points on the west slope <br />collection system in operation. This year there is capability to <br />exchange a maximum of 3,000 acre-feet of' water with the Twin Lakes <br />Reservoi rand Cana 1 Company. The water is to be de 1 i vered to the <br />company at Twin Lakes in exchange for the company making equivalent <br />releases from the headwaters of the Roaring Fork River which would <br />otherwise be diverted through such Twin j Lakes Reservoir and Canal <br />Company collection and diversion system. ! <br /> <br />The Hunter system portion of the west slope :collection system wi 11 be in <br />operation to divert approximately 8,000 acr~-feet of water. Of this, up <br /> <br />22 <br />