Laserfiche WebLink
<br /> <br />~Qc <br /> <br />COLORADO RIVER BTOEAGE PROJECT, <br /> <br />Oompletion ota water system, pit toilets, boat dock, picnic area <br />and campgxound,' circulatory roads, parking areas, and a boat launch- <br />ing ramp at Lem~n Reservoir, Oolo.,isanticipated by the end of the <br />year. , <br />Oamping facilities, roads and parking areas at Paonia Reservoir <br />have been compl~ted. <br />At the Pine River site in the Navajo Reservoir Recreation Area <br />the water supply: and distribution system, the sanitary system and <br />four comfort stations have been completed, In the Oolorado portion <br />of the area, water system, sanitary system, access roads, and a boat <br />launching ramp have been completed at the Arboles sites. <br /> <br />3, ALLocATroN OF FEDl1lRAL INVESTMl1lNT <br /> <br />Section 6 of the authorizing act states that upon completion of each <br />unit, participating project, or separable feature thereof, the Secretary <br />shall allocate the total cost of constructing said unit, project, or feature <br />to the various purIloses authorized in the act or authorized under <br />reclamation law. i No formal allocatious to the several purposes to be <br />served by the project have been made of the cost to June 30! 1964. <br />However, tentative allocations have been made of the total estimated <br />cost of projects nOW under construction (see schedule No.6). The <br />tentative allocatipns are summarized as follows: <br /> <br />, . Purpose Amount <br /> i Percent <br /> I (thousands) <br />" , <br />Reimbursable aJlocations:! <br />IrrIgation. _.__ ~~~ ~~~~ ~~. un _ .__n_.. ._. ... _ _n.. _____.o_.n____ _0_ _ __n n_ un._ $220,316 21.5 <br />Power ._______________~______________n_________,,___________________________..__ 561,102 54.6 <br />MunIcipal and Industrlal water________________________________________________ 35,261 3.4 <br />TotaLh____________~_________________________________________________.._.____ 816,679 79,11 <br />Nonreimbursable allocations: <br />i~!:~~:r8~~1!~:::::~:'::::::::::::::::::::::::::::::::::::::::::::::::::::::: 1,609 ., <br />86,968 3.6 <br />29,921 2.9 <br />Irrigation .(NavaJo Indian irrigation pr~ect) l___"~.~.__.__~n__~u_d_u~___~__ 135,070 18.1 <br />Other nonreimbursable costs: Colora 0 - River fund investigations, non. <br />Federal contributlona. and cost of road relocations under Publio Law 87-874_ 6,696 .7 <br /> ! <br />TotaLn un__n __~. ~.~~M~__~___" ~n _n _ ~~~_ ~___~h__n __n n__~___ __~n n_ 210,264 20.5 <br />TotaL_n._n_n_..,nu~..M~__n__n____.____~___n_n___________~~__~~__n 1,O26,{l43 100.0 <br /> <br />1 Classified as nonrelntbJrsElobie pending determination of J'epayment capabll1ty per soc. 6 of the act of <br />Apr. 11,11156. ' <br />NOTE.-The above aUooa,tlon inoludes only those projeot.<! now under eonstruotlon. <br />