My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05194
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05194
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:17:21 PM
Creation date
10/12/2006 12:54:05 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8510.100.60
Description
Rio Grande Compact Commission
Basin
Rio Grande
Water Division
3
Date
1/1/2000
Title
Report of the Rio Grande Compact Commission 2000
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />": <br />f; <br /> <br />--.,.-..';;;::;:;-,;" <br /> <br />;.;~~~.~ .' <br /> <br />~.' <br />'. <br /> <br />o <br />(:J <br />C") <br /> <br />r <br /> <br />. .; <br /> <br />(~~) <br /> <br />District (MRGCD), with the result that native Rio Grande water was used for river flow <br />purposes below the San Acacia Diversion Dam. Questions and discussion with the Engineer <br />Advisers revealed that the total supplemental water quantity reported by Reclamation was <br />inaccurate, The reported total did not include water resulting from partial draining of the <br />sediment control pool in Jemez Canyon Reservoir. In addition, Reclamation reported that <br />additional supplemental water was made available by MRGCD in exchange for approval by <br />Reclamation of delaying delivery of part ofMRGCD's 1999 contraCt allocation of San Juan- <br />Chama Project water until after the snowmelt runoff season in 2000. Reclamation reported <br />that delayed delivery was made of 6,000 acre-feet of water to EI Vado Reservoir and that <br />Reclamation received one-half of that water for the supplemental water program purposes. <br />This is inconsistent with Table 4 (San Juan-Chama Water Released /Tom Heron Reservoir) of <br />Reclamation's draft annual report entitled "2000 Water Accounting Report to the Rio Grande <br />Compact Commission Engineer Advisers," which shows that all 1999 waivered MRGCD San <br />Juan-Chama Project water was delivered by the end of April 2000. Reclamation also reported <br />that they have not acquired sufficient supplemental water in 2001 to satisfy Reclamation's <br />obligations to pay back water to the MRGCD that was used in 2000 and that the Agreed Order <br />requires be repaid in 200 I, <br />Reclamation's draft annual report entitled "2000 Calendar Year Report to the Rio <br />Grande Compact Commission," provided to the Engineer Advisers on February 27,2001, <br />does not address the 2000 supplemental water program. The Engineer Advisers requested that <br />the informiltiori in the presentation handout entitled "Summary of Rio Grande Water <br />Operations for the Calendar Year 2000" be expanded to include all the extraordinary water <br />acquisitions and uses by Reclamation in 2000. The Engineer Advisers also requested that <br />Reclamation modify their draft report "2000 Calendar Year Report to the Rio Grande <br />Compact Commission" to include complete information regarding the supplemental water <br />program and Rio Grande water operations in 2000, including the information presented orally <br />and as a handout at the Engineer Advisers meeting with the federal agencies. <br /> <br />(:.. <br /> <br />"t~'c:& ':i~"'~'_-<t I. ~~ ~,~5::.~: <br /> <br />8 <br /> <br />~lf;;~,~;.,:oi--:~o(.'~.~~'",~i.: ~ <br /> <br /> <br />II <br />
The URL can be used to link to this page
Your browser does not support the video tag.