Laserfiche WebLink
<br /> 0 <br /> Table 7.--Assumed monthZy scheduZes for proposed and existing irrigation diversions c <br /> F-" <br /> 00 <br /> Reservoir or Control Assumed monthly diversions, in thousands of acre-feet (J;I <br /> diversion pointl Oct. Nov. Dec. Jan. Feb. Mar. Apr. May June July Aug. Sept. "' <br /> Yamco lo-n-n 1 0.12 0 0 0 0 0 0.12 0.36 0.36 0.84 0.60 0.36 <br /> Bea r___nnn 2 .30 0 0 0 0 0 .30 1. 16 2.09 2.77 2.09 1. 16 <br /> Pleasant <br /> Va 11 ey--n- 5 .36 0 0 0 0 0 .36 1.33 2.36 3.20 2.36 1.33 <br /> Dunck I ey-n-- 11 1.30 0 0 0 0 0 1.30 5.40 9.10 12.30 9.10 5.40 <br /> Ca 1 i forn i a <br /> Pa rk---nn 12 1.02 0 0 0 0 0 1.02 4.22 7.36 9.80 7.36 4.22 <br /> Jun i pern---- 18 33.0 0 0 0 0 0 33.0 130 230 310 230 130 <br /> Cross <br /> Mountain--- 19 3.70 0 0 0 0 0 3.70 15.0 26.0 35.0 26.0 15.0 <br /> Pot Hook----- 22 .78 0 0 0 0 0 .78 3.08 5.59 7.19 5.59 3.08 <br />N <br />0 Sandstone--n 23 .45 0 0 0 0 0 .45 1. 70 2.90 3.90 2.90 1. 70 <br /> Craig <br /> Reservoi r-- 27 1.60 0 0 0 0 0 1.60 6.50 11.4 15.0 11.4 6.50 <br /> Gibraltar <br /> Cana12-nn 33 1.80 0 0 0 0 0 1.80 7.30 12.7 16.6 12.7 7.30 <br /> lSee figure 6. <br /> 2Existing. <br /> <br /> <br />, , . <br />