My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP05050
CWCB
>
Water Supply Protection
>
Backfile
>
5001-6000
>
WSP05050
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:16:43 PM
Creation date
10/12/2006 12:48:27 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8273.100
Description
Colorado River Basin Salinity Control - Federal Agencies - Bureau of Reclamation
Basin
Colorado Mainstem
Water Division
5
Date
9/1/1989
Author
DOI BOR
Title
Salinity Update - September 1989 - A Quarterly Report on the Colorado River Water Improvement Program
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />~:'t\~\~\~;; <br />3.1:' i+-' <br />:'*';+:1'. <br />/.t;.':.'0"~ <br /> <br /> <br />:~''''.Jd..'~{~ <br />.. .. "liP: '\1.I.P'.. ..... .... .... .a".IZ', <br />-",- ,-.Sl', -''>'-~~:_-''_ ',,' _ -..''-", ,,~- >,- ,,,,is <br />.~'"p-'C~:;$t/~7;~>; +j i\-<;';>\, ~ ,- -.' - l --- .,': -~"'~~<0--;---~ -'~~~"':-~_;_'> <br />'t'__*;l1lk-~$__-i^~'~.t;Y' ::',-;.<-::-' '- -,' ;,-,-;\-:&--~"-~; -~-%;'_k;-h-e:~~i&:~ <br /> <br /> <br />September 1989 <br /> <br />950 <br /> <br />Recent Salinity Conditions <br />At Imperial Dam <br /> <br />.............,............................................. <br /> <br />900 <br /> <br />850 <br /> <br /> 800 <br />m <br />g 750 ......... <br />I <br />L 700 <br /> 650 <br /> 600 <br /> <br />.............-.................................... <br /> <br /> <br />550 <br />62 83 <br /> <br />84 <br /> <br />SepI85bpreMlllprcMelonal <br /> <br />85 86 <br />Years <br /> <br />87 <br /> <br />88 <br /> <br />89 <br /> <br />Altlwugh high flows had temporaruy lowered salinity levels in the Colorado River <br />system, salinity levels have been rising for 3 years. <br /> <br />USDA/Reclamation program coordination outlined <br /> <br />With passage of the Colorado River <br />Basin Salinity Control Act amendments <br />in 1984, the need for closer coordination <br />between the Bureau of Reclamation and <br />the Department of Agriculture became <br />even more apparent <br /> <br />The USDA Basin Coordinator <br />position was established in 1985 to <br />provide that close coordination. The <br />Coordinator is responsible for coordina- <br />tion and evaluation of USDA salinity <br />control activities in the Basin. The <br />Coordinator, headquartered at the <br />Bureau of Reclamation's Denver Office, <br />is the primary point of contact with <br />Reclamation and USDA agencies. He is <br />also responsible for providing salinity <br />control program assistance for the seven <br />Basin State Conservationists and others <br /> <br />in SCS, and other Federal, State, and <br />local entities and organizations. By <br />means of this position, very close coor- <br />dination is maintained between the <br />Reclamation and USDA agencies. <br /> <br />In response to concerns raised by the <br />Forum and the mandate contained in the <br />amendatory legislation for the Colorado <br />River Salinity Control Program, the <br />Department of the Interior and the <br />Department of Agriculture formed a <br />Technical Policy Coordination <br />Committee (fPCe) in 1985 to improve <br />coordination of the salinity control <br />programs. The committee was origi- <br />nally comprised of representatives of <br />Reclamation and SCS. In recent years, <br />membership has been expanded to <br />include representatives from the Fish <br /> <br />Uinta Basin Project, UT <br /> <br />The Reclamation Uinta Basin Unit <br />Planning Report/Final Environmental <br />Statement was filed with the <br />Environmental Protection Agency on <br />June 25, 1987, and was being held in <br />abeyance by the Assistant Secretary's <br />Office. Secretary Lujan's Science <br />Advisor has requested that the report be <br />returned to the Department for process- <br />ing. Reclamation is reviewing the appro- <br />priate documents to return the Uinta <br />Basin report to the Department. <br /> <br />Phase II of Reclamation's study in <br />the Uinta Basin is being concluded be- <br />cause a cost-effective plan could not be <br />identified. <br /> <br />and Wildlife Service, Geological Survey, <br />Bureau of Land Management, <br />Environmental Protection Agency, and <br />the Agricultural Research Service. This <br />expanded area of coordination was deter~ <br />mined important as the USDA Salinity <br />Control Program accelerated and created <br />additional coordination needs. <br /> <br />In 1989 the TPCC met to address a <br />number of technical coordination issues. <br />The water and salt budgets for the Price- <br />San Rafael joint salinity control plan <br />were developed. Assistance was <br />provided on resolving environmental <br />issues in several salinity units. In addi- <br />tion the TPCC recommended that the <br />Salinity Interagency Committee be <br />reinstated to address Interagency policy <br />issues. <br />
The URL can be used to link to this page
Your browser does not support the video tag.