My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04984
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:16:26 PM
Creation date
10/12/2006 12:46:59 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.111.A
Description
Central Utah Participating Project
State
UT
Basin
Colorado Mainstem
Date
1/1/1984
Author
Central Utah WCD
Title
Municipal and Industrial System Central Utah Water Project Bonneville Unit
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Introduction <br />to the <br />Proposed Plan <br /> <br /> <br />The Municipal and Industrial <br />System of the Bonneville Unit <br />is located in Salt Lake, Utah, <br />and Wasatch Counties. The sys- <br />tem will provide 90,000 acre-feet <br />of water annually for municipal <br />and industrial use in northern <br />Utah County and Salt Lake <br />County. and about 2.000 acre- <br />feet for municipal and industrial <br />use in Wasatch County. The <br />Project will also provide 14,100 <br />acre-feet of water for supplemen- <br />tal irrigation use on 22,740 <br />acres of presently irrigated land <br />in the Heber-Francis area of <br />Wasatch and Summit Counties, <br />generate hydroelectric power, <br />provide flood control. improve <br />recreation opportunities and <br />some esthetic values, and in- <br />clude measures to mitigate <br />fishery and wildlife losses. <br /> <br />The system plan includes con- <br />struction of J ordanelle Reser- <br />voir and Power Plant on the <br />Provo River; completion of <br />Alpine and Jordan Aqueducts <br />now under construction; and <br />stabilization of IS existing <br />upper Provo River reservoirs. <br />A IS-year construction period <br />is anticipated. <br /> <br />The existing Strawberry Reser- <br />voir will be the source of most <br />of the water supply, and this <br />supply will be exchanged <br />through Utah Lake to Jordan- <br />dIe Reservoir by picking up <br />the evaporation losses and <br />other recoveries of an estimated <br />105,000 acre-feet annually. <br /> <br />Project water for municipal <br />and industrial use will be re-- <br />leased from Jordanelle Reser- <br />voir into the Provo River and <br />flow 20 miles dov.'nstream <br />where it \....ill be diverted at the <br />existing Olmsted Diversion Dam. <br />The released flows would be <br />conveyed to areas of use by <br />project aqueducts - the Alpine <br />Aqueduct t(l serve communities <br />in northern Utah County and <br />the Jordan Aqueduct to serve <br /> <br />the metropolitan Salt Lake <br />COUnty area. <br /> <br />Municipal and industrial water <br />delivered to Heber Valley will <br />be released from Jordanelle <br />Reservoir and exchanged for <br />water supplied from springs. <br />The irrigation water delivered <br />co the Heber and Francis areas <br />will be diverted from the river <br />into existing canals both up- <br />stream and downstream from <br />the reservoir, and storage water <br />will also be released down- <br />stream from the reservoir, and <br />storage water will also be re- <br />leased downstream to replace <br />those having rights (Q the river <br />natural flow. <br /> <br />A power plam will be con- <br />structed at the base of Jordan- <br />dIe Dam to generate electrical <br />energy from reservoir releases. <br />Power not required for the <br />Bonneville Unh will be avail- <br />able to existing power systems. <br /> <br />Several other project features <br />will be constructed at Jordan- <br />die Reservoir and fishermen's <br />access will be provided along <br />10 miles of the Provo River im- <br />mediately do\..'nstream. These <br />developments will accommodate <br />additional water-oriemed re-- <br />creation on the reservoir. <br /> <br />Other project measures will be <br />included to develop the reser- <br />voir fishery to compensate for <br />losses of fish and wildlife <br />habitat. <br />
The URL can be used to link to this page
Your browser does not support the video tag.