Laserfiche WebLink
<br />Son Juon River below <br />Lee Acres Bridge <br /> <br />1 8B.50 <br /> <br />185.70 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Table 1 ,-Flow measurements during test <br /> <br />location <br /> <br /> Averoge flows <br />River mile (ds) <br />218.50 '272,00 <br />216.40 132.70 <br />214.40 131.40 <br />209.10 63,00 <br />207,00 87.70 <br />195.80 130.00 <br />194.80 131.1 0 <br /> <br />Son Juan River ot <br />Archuleto <br /> <br />Son Juan River ot <br />Sooring Eogle Lodge <br /> <br />Son Juon River obove <br />Turley Inlet Chonnel <br /> <br />Son Juon River below <br />Hammond Diversion <br /> <br />San Juan River below <br />Blonco Bridge <br /> <br />San Juon River obove <br />Bloomfield Bridge <br /> <br />San Juan River below <br />Bloomfield Sewer <br />Effluent <br /> <br />Son Juan River <br />1/4 mile above Animos <br />River confluence <br /> <br />181.40 <br /> <br />218.70 <br /> <br />1 Due to mechanical limitation, releases from the dam did not provide on exact <br />250 cis release. <br /> <br />Method <br /> <br />During the Test, the river, canal diversions, and canal flows <br />at various points and wasteways were measured, When <br />necessary, flow data were collected through interviews with <br />water users. Attachment A provides a detailed description <br />of flow measurements, analysis, and results, <br /> <br />-10- <br /> <br />Summer Low Flow Test Report - April 2002 <br />