My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04955
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04955
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:16:19 PM
Creation date
10/12/2006 12:46:01 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.116.M
Description
Fruitland Mesa Project
State
CO
Basin
Gunnison
Water Division
4
Date
11/1/1980
Author
CWCB
Title
Fruitland Mesa Project - November 1980
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />4.,'- ..., <br /> <br />COLORAOO WATER CONSERVATION BOARD <br />823 State Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br /> <br />November 1980 <br /> <br />FRUITLAND MESA PROJECT <br /> <br />I NTRO DUCllQl:! <br /> <br />The Fruitland Mesa Water Conservancy District (district) was <br /> <br />established in August, 1960, as the sponsoring and operating <br /> <br />entity for the proposed Fruitland Mesa federal reclamation <br /> <br />project. The district is located in Delta and Montrose Counties <br /> <br />and has irrigated land located within Crystal Creek and Iron <br /> <br /> <br />Creek valleys and on the Fruitland Mesa. The area Is generally <br /> <br />bordered by the Gunnison River on the south and west, Black Mesa <br /> <br />on the east, and Smith Fork on the north. <br /> <br />Th federal project was studied to feasibIlity level In 1962 <br /> <br />by the U.S. Bureau of Reclamatlon. In 1961f, the Fruitland I~esa <br /> <br />Project was authorized by Congress as a participating project of <br /> <br />the Colorado River Storage Project. A Definite Plan Report for <br /> <br />the project was finally prepared by the Bureau In 1977. However, <br /> <br />in that year the project was piaced on the Carter Adminlstra- <br /> <br />tion's "hit list". <br /> <br />Early in 1980, the dlstrict decided to have a study prepared <br /> <br />to see if a project much smaller than the originally proposed <br />
The URL can be used to link to this page
Your browser does not support the video tag.