My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04893
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04893
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:16:05 PM
Creation date
10/12/2006 12:44:17 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8143
Description
John Martin Reservoir
State
CO
Basin
Arkansas
Water Division
2
Date
9/27/1963
Title
News Articles/Press Releases -- September 27 1963 - April 4 1985
Water Supply Pro - Doc Type
News Article/Press Release
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />___::J_ ' <br />::') <br />c) <br />..... <br />W <br />-..t <br /> <br />, <br /> <br />'" <br /> <br />Arkansas River and Tributaries above John, Martin,_Dam ,_Colorado__, _ _ ._ <br /> <br />(c) Sear all costs of operation, maintenance, and replacement <br /> <br />of recreation and fish and wildlife lands and facilities, presently estimated <br /> <br />at $142,200 on an average annual basis; <br /> <br />(2) Provide the water required for initial filling and replenishment of <br /> <br />evaporation and other losses of the recreation pool by purchase or other <br /> <br />means consistent with Federal and State laws (presently estimated to cost <br /> <br />$1,290,000), to assure effective operation of the project for recreation with <br /> <br />. ~ :" <br /> <br />::?y :.~: <br /> <br />provision that one-half of the cost thereof is eligible for credit against the <br /> <br />:.. . .~. .:.. <br /> <br />non-Federal obligation for assuming one-half the separable costs for recrea- <br /> <br />tion and fish and wildlife enhancement; <br /> <br />(3) Prevent encroachments on the channel of Fountain Creek below the <br /> <br />project and maintain a minimum capacity of 15,000 cubic feet per second; <br /> <br />and <br /> <br />"-' <br /> <br />(4) Hold and save the United States free from water rights claims due <br /> <br />to construction and operation of the project. <br /> <br />On the foregoing basis, the net cost to the United States for the recom- <br /> <br />mended improvements is estimated at $38,104,000 for construction and <br /> <br />-=-- ;.. <br /> <br />$119,300 annually for operation, maintenance, and replacements. <br /> <br />The Board further recommended that: <br /> <br />a. Following authorization of the Fountain Dam and Lake project, detailed <br /> <br />site investigation and design be made for the purpose of accurately defining the <br /> <br />11 <br /> <br />. ~-' .. . <br /> <br />,':'- <br /> <br />.'.'. <br />
The URL can be used to link to this page
Your browser does not support the video tag.