Laserfiche WebLink
<br />___::J_ ' <br />::') <br />c) <br />..... <br />W <br />-..t <br /> <br />, <br /> <br />'" <br /> <br />Arkansas River and Tributaries above John, Martin,_Dam ,_Colorado__, _ _ ._ <br /> <br />(c) Sear all costs of operation, maintenance, and replacement <br /> <br />of recreation and fish and wildlife lands and facilities, presently estimated <br /> <br />at $142,200 on an average annual basis; <br /> <br />(2) Provide the water required for initial filling and replenishment of <br /> <br />evaporation and other losses of the recreation pool by purchase or other <br /> <br />means consistent with Federal and State laws (presently estimated to cost <br /> <br />$1,290,000), to assure effective operation of the project for recreation with <br /> <br />. ~ :" <br /> <br />::?y :.~: <br /> <br />provision that one-half of the cost thereof is eligible for credit against the <br /> <br />:.. . .~. .:.. <br /> <br />non-Federal obligation for assuming one-half the separable costs for recrea- <br /> <br />tion and fish and wildlife enhancement; <br /> <br />(3) Prevent encroachments on the channel of Fountain Creek below the <br /> <br />project and maintain a minimum capacity of 15,000 cubic feet per second; <br /> <br />and <br /> <br />"-' <br /> <br />(4) Hold and save the United States free from water rights claims due <br /> <br />to construction and operation of the project. <br /> <br />On the foregoing basis, the net cost to the United States for the recom- <br /> <br />mended improvements is estimated at $38,104,000 for construction and <br /> <br />-=-- ;.. <br /> <br />$119,300 annually for operation, maintenance, and replacements. <br /> <br />The Board further recommended that: <br /> <br />a. Following authorization of the Fountain Dam and Lake project, detailed <br /> <br />site investigation and design be made for the purpose of accurately defining the <br /> <br />11 <br /> <br />. ~-' .. . <br /> <br />,':'- <br /> <br />.'.'. <br />