My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04884
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04884
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:16:02 PM
Creation date
10/12/2006 12:44:08 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8149.100
Description
Miscellaneous Small Projects and Project Studies - NRCS-Ft Lyon Canal Co Limestone Graveyard Creeks
State
CO
Basin
Arkansas
Water Division
2
Date
3/31/1993
Author
Gronning Engineering
Title
Alternatives to Water Transfer excerpt with related documents
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />3495 <br /> <br />March 1993 <br />DRAFT <br /> <br />status ReDort from the Colorado Water Conservation Board <br />Ft. Lyon Canal Company Transfer <br />Alternative study <br />Authorized by SB92-87 <br /> <br />The following status report has been prepared by the Colorado <br />Water conservation Board (Board) and is being submitted to the <br />General Assembly to advise that body of progress on the study <br />authorized by section 11 of SB92-87. <br /> <br />Summarv: <br /> <br />The Board's study of Ft. Lyon Canal Co. water transfer <br />alternatives is approximately 50% complete as of March 1, 1993, <br />The study is being conducted by a multi-disciplinary team assembled <br />by the prime contractor, Gronning Engineering Co. (GEC) of Denver, <br />Co. <br /> <br />Significant local input has been obtained in formulating the <br />study and more will be sought as options are evaluated. The study <br />will address transfer issues from the various perspectives of Ft. <br />Lyon shareholders, other water rights owners, and the residents of <br />the Arkansas Valley who could be impacted by such a transfer. <br />The study is being coordinated with, and will make use of <br />information from, several other study projects in the region, <br />including those conducted by the Colorado Division of wildlife, <br />Boyle Engineering~r the Kansas v.Colorado litigation, Task Force <br />II, and the U.S, Geological Survey. <br /> <br />Phase I, planned for completion by mid-April, will evaluate <br />the feasibility and applicability of numerous innovative <br />alternatives to the traditional method of transfering agricultural <br />water. Phase II, to be completed by October 1, 1993, will develop <br />a plan for implementing one or more of those alternatives, for use <br />by the Ft. Lyon Canal Co. and/or its shareholders at the <br />
The URL can be used to link to this page
Your browser does not support the video tag.