My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04844
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04844
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 10:27:46 PM
Creation date
10/12/2006 12:41:23 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407.500
Description
Platte River Basin-River Basin General Publications-Missouri River General Publications
Date
11/5/1974
Author
MRBC
Title
1975 Water Assessment-Missouri River Basin-Memorandum of Agreement Between the Missouri River Basin Commission and the US Water Resources Council 2-Approved and Transmitted
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />TABLE 2 - SCHEDULE OF ACTIVITIES <br /> <br />Activity - <br />Subactivity <br />PHASE I <br /> <br />ACTIVITY ONE -- PREH1PLEf1ENTATION <br /> <br />1410 <br /> <br />PHASE II <br /> <br />ACTIVITY ONE -- PROBLEM IDENTIFICATION <br />Subactivity 1 -- Participant Selection <br />Subactivity 2 --Develop Initial Problem and Issue List <br />Subactivity 3 -- Define Tentative Analytical Areas <br />Subactivity 4 -- Obtain Regional Review and Reaction <br />to Problems and Issues <br /> <br />, <br />N <br />-'" <br />I <br /> <br />ACTIVITY TVJfl -- SELECT STATE/REGIONAL DESIRES AND OBJECTIVES; SCREEN <br />PROBLEt1; AND DOCUrmH ASSUMPTIONS AND r1ETHODOLOG I ES <br />Subactivity 5 -- Review and AnalysiS of Nationwide <br />Analysis Results <br />Subactivity 6 -- Develop State Preference Future <br />Subacti vity 7 -, Develop Regi onal Preference Future <br />Subactivity 8 -- Regionwide Review of the Regional <br />Preference Future <br />Subactivity 9 -- Finalize the Regional Preference Future <br />Subactivity 10 - Documentation of the Differences Between the <br />Modified Central Case and the Regional <br />Preference Future <br />Subactivity 11 - Regroup and Screen Problems <br />Subactivity 12 - Develop a Final Problem and Issues List <br /> <br />ACTIVITY THREE -- DEVELOP INFORMATION DESCRIBING SELECTED PROBLEMS <br />Subactivity 13 <br />Subactivity 14 <br /> <br />- Develop Effects Information for Each Problem <br />Define Potential Level B, Special, Level C, <br />Implementation Study Areas <br />Develop Study AI"ea Effects Information <br />Document the Differences Between the <br />Modified Central Case and the Regional <br />Preference Future <br />Evolve the Federal, State and Private Role <br />for Resolving the Problems <br /> <br />Subactivity 15 <br />Subactivity 16 - <br /> <br />Subactivity 17 - <br /> <br />Ii/iLl I.,. <br /> <br />Schedule <br />1974 1975 1976 1977 <br />JASOND JF~lAMJ~ASOND JF~1Af-l JASOND JFMAr1 JASOrm <br /> <br />*** * <br /> <br />**** <br /> <br />x <br />XX <br />X <br />XX <br /> <br />lr***** ** <br />~ <br />XX <br />XX <br /> XX <br /> X X <br /> X <br /> XX <br /> X <br /> ***' ** <br /> XXX <br /> X <br /> X~ <br /> X <br /> X <br />
The URL can be used to link to this page
Your browser does not support the video tag.