My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04844
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04844
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 10:27:46 PM
Creation date
10/12/2006 12:41:23 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407.500
Description
Platte River Basin-River Basin General Publications-Missouri River General Publications
Date
11/5/1974
Author
MRBC
Title
1975 Water Assessment-Missouri River Basin-Memorandum of Agreement Between the Missouri River Basin Commission and the US Water Resources Council 2-Approved and Transmitted
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1.411 <br /> <br />Activity - <br />Subacti vity <br /> <br />Participant <br /> <br />Designated Responsibility <br /> <br />Subactivity 19 -- Establish <br />Priorities <br /> <br />Subactivity 20 -- Prepare the State/ <br />Regi onal Report <br /> <br />Subactivity 21 -- Regionwide Review <br />of the State/ <br />Regi onal Report <br /> <br />I <br />N <br />W <br />I <br /> <br />Subactivity 22 -- Final Specific <br />Problem Analysis <br />Report <br /> <br />Group A <br /> <br />t1RBC Staff <br /> <br />Overview <br />Committee and <br />~1RBC <br /> <br />~1RBC Staff <br /> <br />Overview <br />Commit tee <br /> <br />Group Band <br />Overview <br />Committee <br /> <br />i~RBC Staff <br /> <br />~1RBC Staff <br /> <br />~lRBC <br /> <br />Establish and document a set of priorities by time frame <br />(1975-1985 and 1985-2000) for Level S, special, Level C, and <br />implementation programs. <br /> <br />Compil e and document the results from Group A. <br /> <br />The Overview Committee submits the priority listings from <br />subactivity 18 to the i~issouri River Basin Commission for <br />endorsement. <br /> <br />Prepare the state/regional report. <br />Review of the state/regional report. <br /> <br />Review and comment on the state/regional report. <br /> <br />Document the results of the regionwide review. <br />Prepare the final specific problem analysis report. <br /> <br />Review and endorse the final report and transmit it to WRC, <br />regional participants and others as appropriate. <br /> <br />PHASE I II <br />ACTIVITY ONE <br /> <br />REGIONAL REVIEW OF THE <br />NATIONAL REPORT <br /> <br />Subactivity 1 n Review and Comment <br />on the National <br />Report <br /> <br />All Regional <br />Participants <br /> <br />t1RBC Staff <br /> <br />Overview <br />Committee <br /> <br />MRBC <br /> <br />Review and comment on the draft national report. <br /> <br />Compile and analyze all comments; and prepare <br />a draft of the official MRBC comments on the National report. <br /> <br />Approve the staff report relative to the regional review. <br /> <br />Endorse and transmit the official co~nents on the national <br />report to \'JRC, <br />
The URL can be used to link to this page
Your browser does not support the video tag.