Laserfiche WebLink
<br />Section VI - Progress Reporting <br />The MRBC will submit to the WRC a progress report at quarterly <br /> <br />intervals. The primary purpose of this report is to indicate progress and <br />to highlight problems encourtered (or expected to occur) which may require <br />special attention. Also, at the completion of each activity, the MRBC <br /> <br />will submit to the WRC a technical memorandum containing a description of <br /> <br /> <br />the subactivities performed and the products (identified in Section III) <br /> <br />r- which have been developed. <br />~ <br />~ <br />~ Section VII - Modification Procedures <br /> <br />The possible need for modification, amendment and/or revisions to this <br /> <br />110A during implementation is recognized. The t1issouri River Basin Commission <br /> <br />concurs with the WRC that maximum flexibility is desired in conducting the <br /> <br /> <br />1975 Assessment. Therefore, because of tight time schedule and the <br /> <br />difficulty in being able to clearly describe what is a "major change," the <br /> <br />Missouri River Basin Commission proposes the fOllowing minimal requirements <br /> <br />as guidelines for revisions: <br /> <br />A major change is defined to be one which the WRC project <br /> <br />officer and the Missouri River Basin Commission concur is of <br /> <br />substantial importance relative to the objectives, implementation <br /> <br />procedures, or products of this agreement. For such revision, <br /> <br />whether suggested by the WRC or by the Missouri River Basin <br />Commission, the proposed change as well as the response (both <br />supported by appropriate documentation) are to be documented, <br />and the change will not be executed prior to mutual agreement. <br /> <br />Proposed minor changes may be executed following <br /> <br />communication between the /1RBC regional study director and <br /> <br />the WRC project officer (or his desi~nee); such changes are to <br /> <br />be reported by the Missouri River Basin Commission in its sub- <br /> <br />sequent quarterly status/progress report. <br />-17- <br />