Laserfiche WebLink
<br />':'-.1 <br />~ <br />.. <br />.-l <br /> <br />physical, legal, financial and institutional arrangements. If <br /> <br /> <br />existing constraints are such that a problem can not be <br /> <br /> <br />solved, the limiting factor or factors will be identified and narratively <br /> <br />discussed. <br /> <br />The study director will prepare a technical memorandum documenting the <br /> <br />results of activity three. Upon approval by the Overview Committee and <br /> <br /> <br />endorsement by the MRBC it will then be transmitted to WRC, <br /> <br />ACTIVITY FOUR - ESTABLISH STATE/REGIONAL PRIORITIES, DEVELOP COnCLUSIONS <br />AND RECOMMENDATIONS AND PREPARE THE STATE/REGIONAL REPORT <br /> <br />The objectives of this activity are to: (1) establish state/regional <br /> <br />priorities for Level B studies, special studies, level C studies, and <br />implementation programs; (2) develop recommendations and conclusions for <br /> <br />resolving the problems in the region; and (3) prepare a state/regional report. <br /> <br />To accomplish these three objectives five subactivities will be conducted <br /> <br />by the regional assessment participants. <br />Subactivity 18 - Develop Conclusions and Recommendations <br /> <br />During this subactivity the information that has been evolved in the <br /> <br />previous subactivities will be synthesized to evolve conclusions and <br /> <br />recommendations concerning: <br /> <br />. Needs for planning--identify and recommend the time frame (1975- <br />1985 and 1985-2000), the geographic area covered, and the type of <br />study or program (level B, level C, special, implementation) that <br />should be conducted to resolve problems within each study area. <br /> <br />. Needs for research and data collection--recommend programs that <br /> <br />should be modified or broadened to meet the future needs. <br /> <br />. Needs for changes in the current institutional, financial, legal, <br /> <br />and socio-economic water and related arrangements, policies and <br /> <br />programs that should be implemented in each time frame (1975-1985 <br /> <br />and 1985-2000) to provide an improved base for resolving the <br />problems within the Missouri Region. <br />-12- <br />