My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04844
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04844
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 10:27:46 PM
Creation date
10/12/2006 12:41:23 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407.500
Description
Platte River Basin-River Basin General Publications-Missouri River General Publications
Date
11/5/1974
Author
MRBC
Title
1975 Water Assessment-Missouri River Basin-Memorandum of Agreement Between the Missouri River Basin Commission and the US Water Resources Council 2-Approved and Transmitted
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />c..o <br />r;\Z <br />~ <br />~ <br /> <br />and desires and especially with its socio-economic and associated land and water <br />utilization projections. To evolve the state preference future, the Group A <br />participants from the Missouri River Basin states will determine and document <br />each state's objectives, desires and goals along with projections of socio- <br />economic conditions including the associated water and land use for the <br /> <br />years 1985 and 2000 by ASA or state portion of each ASA. The assumptions <br />or methodologies different from those of the modified central case will be <br />documented. Upon receipt of this state information the staff will synthesize <br />the data, summarize it for each aggregated subarea (as defined by the ,later <br />Resources Council) and compare it to the results furnished by the Water <br /> <br />Resources Council describing the modified central case. The modified central <br /> <br />case is the level of development allocated to each region from a federal <br /> <br />viewpoint, determined during the national analysis portion of the assessment. <br />Figure 5, \~il1 be used to display the comparison betv/een the modified central <br />case and the state preference future. <br /> <br />Subactivity 7 - Develop the Regional Preference Future <br />To evolve the regional preference future the results of the nationwide <br />analysis (modified central case) and the state preference future will be <br />reviewed and analyzed by the Group A participants. These participants <br />in cooperation with the MRBC staff will utilize such data and information <br />to document the state/regional viewpoint and to display the extent of <br />agreement or disagreement with information contained in (1) the modified <br />central case set of projections, (2) the modified central case assumptions <br /> <br />and methodologies, (3) the adequacy analysis, and (4) the effects <br /> <br />information as shown in Figure 5. <br /> <br />Subactivity 8 - Obtain Regionwide Review of the Reqional Preference Future <br /> <br /> <br />The necessary information will be provided to the Group B participants <br /> <br />for a regionwide review of and comment on the regional preference future <br /> <br />-8- <br />
The URL can be used to link to this page
Your browser does not support the video tag.