My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04844
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04844
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 10:27:46 PM
Creation date
10/12/2006 12:41:23 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407.500
Description
Platte River Basin-River Basin General Publications-Missouri River General Publications
Date
11/5/1974
Author
MRBC
Title
1975 Water Assessment-Missouri River Basin-Memorandum of Agreement Between the Missouri River Basin Commission and the US Water Resources Council 2-Approved and Transmitted
Water Supply Pro - Doc Type
Operating Principles/Plan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Schedule A <br /> <br />Memorandum of Agreement (MOA) <br /> <br />between the <br /> <br />Missouri River Basin Commission <br /> <br />and the <br /> <br />U.S. Water Resources Council <br /> <br />1975 Assessment of Water and Related land Resources <br /> <br />Section I -- Scope of Agreement <br />This document describes the role and responsibilities of the Missouri <br /> <br />River Basin Commission (MRBC) in fulfilling the detailed procedures to be <br /> <br /> <br />followed in conducting Phases II and III of the specific problem analysis <br /> <br /> <br />portion of the 1975 Assessment as well as the products that will result <br /> <br />therefrom. Specifically,attention is directed toward describing who, when, <br /> <br />where, and how the t1issouri River Basin Commission in cooperation with the <br /> <br /> <br />U.S. Water Resources Council (HRC) will conduct the activities referred to <br /> <br />C"') <br />C"'l <br />CO <br />..-I <br /> <br />in the Missouri River Basin re~ion. <br /> <br />This document also includes an outline of the specific problem analysis <br /> <br />report which is to be prepared by the ~1issouri River Basin Commission, an <br /> <br />organizational structure for carrying out the assessment activities, a <br /> <br />summary of the work schedules and financial plans, and a proposed procedure <br /> <br />for reporting progress to the WRC. <br /> <br />Section II -- Public Participation <br />The public participation in the specific problem analysis portion of <br /> <br />the assessment will be accomplished utilizing Group B participants as <br /> <br />described in Section III of this agreement. However, the states are <br /> <br />prinarily responsible for their respective public involvemc:lts. Each state <br /> <br />member of the W{BC represents his state and the public therein. It is the <br /> <br />member's responsibility, therefore, to insure appropriate cooperative <br /> <br />-~" --------~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.