Laserfiche WebLink
<br /> <br />~.. <br /> <br />. . <br /> <br />:.W. .. <br />:\1:\ 1:-'; .\QU EI)lil"T <br /> <br />23 <br /> <br />July 1. 19-10 to June :~O. 19-11. there were~:! outn)!es due to lightning <br />disturbances 011 the :!:30 kv line, averaging about one minute each. <br />Seventeen of these outalles occurred during AUllllst and September. <br />In no case did damage to the line prevent immedi.\te rl'sumption <br />of service. The 210.milc patrol rond was maintained, impruved. <br />and extended during the year. <br />A cross connection between the 2;W kv switch racks of the <br />Distl'ict and the Southern California Edison Company at Boulder <br />Dam was installed to pro\"ide for emerJ!cncy illlcrclmnge of gener- <br />atinR capacity between the two systems. In August HIIO this <br />connection was utilized in testing the operation of the Edison <br />Company's 50-cycle llenemting units 1\1 60 cycles on the District's <br />system. .and the operation of the District's L1nit at ;JO cycles 011 the <br />Edison system. These tests demonstrated the feasibility of n....dp- <br />rocal use of Kt'nerating' equipment in an emergency. <br />The :t~ h tmnsmission line of the Ul1ited States Ottice of Indian <br />A/fairs servin$( the Colorado River Indian Uesl'rvntioll. the town <br /> <br />r <br /> <br /> <br />-- <br /> <br />- - <br /> <br />... <br />I <br /> <br />.),.~ -;../. <br /> <br />i!30 1.:1' frf"'''lIniS,'lion filiI' <br /> <br />