My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04825
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04825
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:15:47 PM
Creation date
10/12/2006 12:40:22 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.140.20
Description
Colorado River Basin Organizations and Entities - Colorado River Basin States Forum - California
State
CA
Basin
Colorado Mainstem
Date
1/1/1939
Author
Metro Water District
Title
Metropolitan Water District of Southern California - History and First Annual Report
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />,..,' ..... <br />J..U':'~' <br /> <br />CH.,\I'Trn ~ <br /> <br />SPECIFICA nONS AND CONTRACTS <br /> <br />The preparatioll of specillc.atiolls for construction, and for con. <br />sh'uction equipment and materials. W.IS fully con~red in the history <br />and lir"st allllual report. tog-ether with the related testing and inspec- <br />tion of work and material in process. <br />In the tWo-"n~nr period of this report the District has issued 5.1 <br />major specifications for construction and for furnishing supplies, <br />materials, and equipment. making a toL'l1 of 335 issued up to June <br />30, 19.10. A considerable number of minor specifications, covering <br />miscell.U\euus work, materials, .Uld et'luil-lrnent have also been issued. <br />These resultl'd in li7 formal contmcts for a total to date of .172, <br />with aggregate earniuj.!s of $1l~,597,1-12.0l, and estimated total <br />contract value of $121,011,000. <br />Table 21 lists all the prillcipnl cOlIstruction contracts on the <br />main aqueduct and distribution system and gives data on contnlc. <br />tors' JX!rsollJlel and dates of work. Relations between the contrac- <br />tors and the District oqmllization ha\"c been ex(,'cllcnt. S.ltisfactory <br />settlements of all cOJJlpleted contracts were reached, except that <br />litigation in connection with the Wenzel & lIenoch Construction <br />Company contract for S~1ll Jacinto tunnel is still pending, as noted <br />elsewhere in this report. <br /> <br /> <br />Outlet gates at Coppa Basin <br />(1):'1] <br />
The URL can be used to link to this page
Your browser does not support the video tag.