Laserfiche WebLink
<br />N <br />f'-J <br />~ <br />o <br /> <br />5. Scope and status of CRSC program implementation <br /> <br />a)funding (TA' FA) <br />b)acres treated <br />c)no. contracts <br /> <br />d)CRSC cost shared <br />PRACTICES INSTALLED - UNITS <br />pipe1.ine ft. (on-farm) <br />pipeJ.ine rt. (off-farm) <br />ditch lining ft. (on-farm) <br />ditch lining ft. (off-farm) <br />land leve1.ing ac. <br />sprinkler system no. lac. <br />improved sur. sys. no./ac. <br />drip system no. lac. <br />regulating reservoir no. <br />structures (FY92 to date) <br />ponds no. (FY91 to date) <br />irrigation water mgt. ac. <br />wildlife wet. mgt. ac. <br />wildlife up. mgt. ac. <br /> <br />e)CRSC non-cost shared <br />PRACTICES INSTALLED - UNITS <br />pipeJ.ine ft. <br />ditch lining ft. (on-farm) <br />land leveling ac. <br />drip system ac. <br />improved irr. systems ac. <br />irrigation water mgt. ac. <br />tree planting ac. <br />structures (FY92 to date) <br />pond no. (FY 91 to date) <br />wild1.ife wet. mgt. ac.(FY94 on) <br />wildlife up. mgt. ac.(FY94 on) <br /> <br />FY95 <br /> <br />CumUlative <br /> <br />$2,6!H,107 <br />1,087 <br />22 <br /> <br />$20,462,968 <br />24,008 <br />292 <br /> <br />141,934 <br />47,407 <br />24,.01.9 <br />2,71J. <br />246 <br />14/283 <br />133/4408 <br />9/37 <br />o <br />82 <br />o <br />6,534 <br />64 <br />77 <br /> <br />821,420 <br />157,214 <br />98,988 <br />35,872 <br />1,508 <br />57/1335 <br />431/12,782 <br />671468 <br />3 <br />260 <br />13 <br />27,026 <br />336 <br />448 <br /> <br />40,593 <br />5,209 <br />55 <br />o <br />o <br />o <br />J. <br />5 <br />o <br />J.1 <br />1 <br /> <br />286,035 <br />64,733 <br />784 <br />76 <br />622 <br />4,1.86 <br />20 <br />52 <br />22 <br />14 <br />8 <br /> <br />f) wildlife habitat created (ac.by type) or (values by type) <br />see wildlife section of this report. <br /> <br />TA = Technical assistance, Monitoring and Evaluation, <br />Information/Education Activities <br />FA a CRSC contracts, obligated cost/share amounts <br />CRSC cost shared = sum of CRSC Annual Progress Reports from <br />Delta F.O. and Montrose F.O. <br />CRSC non-cost shared = Progress Totals of Delta F.O, and <br />Montrose F.O. less CRSC Annual Progress Reports <br /> <br />4 <br />