My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04812
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04812
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 10:28:05 PM
Creation date
10/12/2006 12:39:53 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8147
Description
Gunnison-Arkansas Project
State
CO
Water Division
4
Date
6/1/1948
Author
US DoI BoR
Title
Interim Report Gunnison-Arkansas Project Colorado Appendix B Water Supply
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />_.~m <br /> <br />e) <br /> <br />-. <br /> <br />I, <br /> <br />., "I.' . <br />,1.G..,U~'L _, ,_ , <br /> <br />(Introduotion) <br /> <br />In addition to the imported water from the Fryingpan River, exoess <br />flood flows of the Arkansas River a.mou"ti:1f: to an average of 5,700 acre- <br />feet annually would be made available for project use. <br /> <br />The following discussion presents results of detailed water sup?ly <br />studies for the Initial Development. J,. brief resume of pos si ble projeot <br />expansion is also included in the appendix, but further investigations <br />are required before definite amounts of water avuilable for diversion <br />to the Eastern Slope from the vurious sources eun be determined. This <br />a?pendix is not intended to be a co"'ple te coverage of the water supply, <br />but is only that information which it "as possible to correlate am <br />assemble prior to April 1, 1948. <br /> <br />The operation study in Chapter 3f of this appemix was prepared <br />for the study period 1930 tr~ough 1941. This 12-o~~r period was used as <br />it is the most critical 12 years of record and is thought to be the <br />worst drou(;ht p"riod t'lEl t ean be reasonably Clxpected under project oper- <br />o.tion. Irri;ation and power deliveries for that 12-ycur period are <br />classified as firm and could be "lllintained throuGhuut the life of the <br />proj oct. <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.