My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04766
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04766
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:15:31 PM
Creation date
10/12/2006 12:37:56 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.122.E
Description
Paonia Project
State
CO
Basin
Gunnison
Water Division
4
Date
5/1/1957
Author
USDDOI Bureau of Rec
Title
Paonia Project Colorado Definite Plan Report
Water Supply Pro - Doc Type
Definite Plan Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />SUMMARY SHEETS (Continued) <br /> <br />BENEFITS, ALLOCATIONS, AND REPAYMENT <br /> <br />Allocations (Tentative) <br />Annual <br />Benefits Construction O.M.&R. <br />(annual) , costs costs <br />Irrigation. . . . $639,900 ~*7h984,400 $22,000 <br />Flood control . . 2,000 ~72,000 0 <br />Recreation. . . . 2,800 g(7,500 1,000 <br />Fish and wildlife . . 4,200 0 0 <br />To'cal.. . . 648,900 7, 763,900 23,000 <br />11 $2,320,000 will be repaid by Paonia project irrigators <br />through the Upper Colorado River Basin Fund and the remaining <br />$5,364,400 will be paid from other revenues in tbe basin fund <br />apportioned to Colorado. <br />g/ Nonreimbursable. <br /> <br />BENEFIT-COST RATIO <br /> <br />IRRIGATION <br /> <br />2.73 to 1 <br /> <br /> Irrigable land (acres) <br />Fire Mountain division Leroux Creek division <br /> Non- Non- <br />Land Irri- irri- Irri- irri- Project <br />class gated gated Total gated gated ' Total total <br />Class 1 2,550 10 2,560 590 - 590 3,150 <br />Class 2 4,810 820 5,630 3,660 730 4,390 10,020 <br />Class 3 635 270 905 510 510 1,415 <br />Class 4(fruit) 275 400 675 40 40 715 <br />Total 8,2701,500 9,770 4,800 730 5,530 15,300 <br /> <br />Elevation of project lands (feet msl). <br />Frost-free period (avg. days annually) . . . <br />Effective precipitation (avg. feet annually) <br /> <br />. <br /> <br />Fire <br />Mountain <br />division <br /> <br />Diversion requirement (avg. annual) <br />Acre-feet per acre. . . . . . . <br />Acre-feet. . . . . . . . . . . . <br />Water supply (avg. ac.-ft. annually) <br />Witbout project. . . <br />Project increase. . . . . . . . . <br />Total with project. . . . . . . <br />Increased depletion of Colorado River from <br />project operation (avg. annual ac.-ft.). <br /> <br />. <br /> <br />4.28 <br />39,300 <br /> <br />24,600 <br />13,800 <br />38,400 <br /> <br />2 <br /> <br />5,400-6,800 <br />160 <br />.28 <br /> <br />Leroux <br />Creek <br />diVision <br /> <br />3.68 <br />19,100 <br /> <br />11,900 <br />6,300 <br />18,200 <br /> <br />9,820 <br />
The URL can be used to link to this page
Your browser does not support the video tag.