Laserfiche WebLink
<br />Glenwood-Dotsero Springs <br /> <br />5/84 <br /> <br />6/86 <br /> <br />LaVerkin Springs <br /> <br />86 <br /> <br />o <br />..s.::. <br />C.J1 . <br />. .. <br />c:.o <br /> <br />Lower Virgin River <br /> <br />87 <br /> <br />Publ. 12/81 <br />Publ. 9/81 <br />Publ. 3/82 <br />5/84 <br />Publ. 1/83 <br /> <br />Li tt1e ColOl'ado <br /> <br />Lower Gunnison <br /> <br />12/81 <br /> <br />12/82 <br /> <br />illjancos Valley <br /> <br />HcBlmo Creek <br /> <br />9/83 <br />2/83 <br /> <br />2/84 <br />6/85 <br /> <br />['jeeker Dome <br /> <br />Price-San Rafael Rivers <br /> <br />3/86 <br /> <br />9/85 <br /> <br />Publ. 2/81 <br />10/84 <br /> <br />l'loapa Valley <br /> <br />Palo Verde I.D. <br /> <br />i~ot scheduled <br /> <br />Uinta Basin <br /> <br />3/83 <br /> <br />4/84 <br /> <br />Publ. 1179 <br /> <br />B1 g Sandy River Unit - The current plan, recommended <br />by Reclamation, would remove saline water by collection wells <br /> <br />in the spring and seep area of the Big Sandy River and pump <br /> <br />the water via a pipeline to a proposed Chevron fertilizer <br /> <br />plant near Rock Springs for use and disposal. the final <br /> <br />Reclamation/State joint report was presented to the State <br /> <br />Legislatul'e in Decembel' 19S2. The State has provided funds <br />for acceleration of the study through the Wyoming Water <br /> <br />Development Commission. Draft appendices and the draft <br /> <br />plan formulation working document have been completed and are <br /> <br />under review. <br /> <br />The recommended plan was reformulated to <br /> <br />exclude the Bone Draw Collector well field. The State of <br /> <br />Wyoming may consider an independent review by an engineering <br /> <br />consultant of the USDA and Reclamation plans. <br /> <br />-14- <br /> <br />J. <br /> <br />"";,, . <br />