My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04701
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04701
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:15:13 PM
Creation date
10/12/2006 12:31:59 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8446
Description
Cache La Poudre Project
State
CO
Basin
South Platte
Water Division
1
Date
11/15/1981
Author
Ward Fischer
Title
Poudre Study
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. . <br /> <br />II. DESCRI?TION OF !,1AJOR NORK TASKS <br /> <br />GENE~L <br />The major work tasks required for the successful completion <br />of the Cache la poudre Study, are presented in this section. A <br />bar chart for the major wo~k tasks is shown in Figure II-I. A <br />brief description of the major tasks for each phase is presented <br />below. <br /> <br />PHASE I: PRELIMINARY ACTIVITIES <br />The major tasks during this phase of the study will consist <br />of the collection and review of data, and will also include the <br />preparation of an overall management plan for the study. The <br />overall plan of study presented in this proposal will be expanded <br />to form the management plan for the actual study. T:.e tasks pre- <br />sented in this proposal will be refined into sub-tasks and the <br />flow chart, work schedule and manpower distribution will be pre- <br />sented in more detail. The management plan will be the basis for <br />management of the study, progress reporting and cost accounting. <br />Existing data relevant to the Cache la poudre Project will <br />be identified and assembled. Por more than 50 years, the Bureau <br />of Reclamation has studied the development of the water resou~ces <br />of the basin, and the Bureau will be the primary source of data <br />on identified potential facilities. The Bureau, U.S. Geological <br />Survey, and Northern Colorado Water Conservancy District will all <br />be sou~ces of hydrologic data; however, the Colorado Water Re- <br />sources Research Institute will be the prime source of data, since <br />they have already compiled or have available to them most of the <br />data required for use in the MODSIM model. Data on water uses <br />and economics will be obtained from potential water users such <br />as the Northern Colorado Water Conservancy District, the cities <br />of Fort Collins and Greeley, and appropriate Federal ,and state <br />agencies. Water rights information will be acquired from the <br />State of Colorado. The CWCB will be consulted to insure that all <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.