My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04701
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04701
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:15:13 PM
Creation date
10/12/2006 12:31:59 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8446
Description
Cache La Poudre Project
State
CO
Basin
South Platte
Water Division
1
Date
11/15/1981
Author
Ward Fischer
Title
Poudre Study
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />" <br /> <br />! <br />i <br />\ <br /> <br />(!OGh e. Ie( ~{.(ci,.c <br /> <br />. <br /> <br />. <br /> <br />I. PL&~ OF STUDY <br /> <br />GENERAL <br />The proposed study of the economic and engineering feasi- <br />bility of the Cache la Poudre Project will be conducted according <br />to the plan of study outlined below. A flow chart for the plan <br />of study is included at the end of this section as Figure 1-1, <br />and a more detailed description of the major work tasks and <br />schedule for the plan of study are presented in Section II of <br />this proposal. The plan of study will be divided into five major <br />phases. During the initial phase of the study, existing data <br />relevant to the project will be assembled and reviewed. The sec- <br />ond phase of the study will be an inventory of available resources <br />and an evaluation of the demand to utilize these resources. Phase <br />III of the study will be a preliminary plan formulation, which <br />will be followed by the reconnaissance level plan formulation <br />during Phase IV. Phase V of the study will consist of review of <br />the previous phases of the study and report preparation. <br />The complexity of existing and potential facilities for the <br />development of the water resources of the Cache la Poudre Basin, <br />along with the many present and projected demands on the surface <br />water supplies, could result in an untold number of possible devel- <br />opment combinations and operational schemes. Tudor proposes to <br />identify a plan for development of the surface water supplies <br />of the basin within the existing institutional and political <br />framework. The purpose of this study will be to identify this <br />development plan in a logical and systematic manner, considering <br />as many reasonable combinations of facilities (projects) as is <br />possible within the constraints of time and funding. A number of <br />possible projects will be considered and tested in the preliminary <br />phase to identify a candidate project to be considered at the re- <br />connaissance level of study. To facilitate handling of the vast <br />amount of data associated with the many alternative projects, <br />Tudor plans to make use of its automatic data processing capability <br /> <br />", <br />( <br />
The URL can be used to link to this page
Your browser does not support the video tag.