My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04698
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04698
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:15:12 PM
Creation date
10/12/2006 12:31:57 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8273.100
Description
Colorado River Basin Salinity Control - Federal Agencies - Bureau of Reclamation
Basin
Colorado Mainstem
Water Division
5
Date
5/22/1992
Author
BOR
Title
Uncompahgre Project SO-JU Study
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br />~.., <br />f,j <br />'-11 <br /> <br />b. CHO turnouts. <br /> <br />. <br /> <br />3. Need for Desian Revisions/Modifications <br /> <br />The assumption that 2 or 3 inches of concrete lining would <br />be adequate in this area is not reasonable due to expansive <br />soils. The UVWUA's experience has shown that thin unreinforced <br />concrete lining does not effectively withstand the weather and <br />soil conditions in the.Montrose and Del~a area. <br /> <br />CHO turnouts 'would not be used. It would be more cost <br />effective to use division-boxes, Parshall flumes and stilling <br />pools as measurement devices because the UVWUAcan construct <br />them. <br /> <br />Waterway protection on the Grand Valley Project, currently <br />underway, is being replaced in~kind and not improved. This <br />precedent will be followed on this project. Any additional <br />waterway protection that is desired will be left to the <br />discretion of the UVWUA and not funded under this proposal. <br /> <br />In the FR/FEIS, two canal systems were used to develop <br />designs for the canals and the cost of the rest of the system was <br />prorated based on this sample information. One of the systems ... <br />used to develop the preliminar~ designs is located on the west <br />side and will not be included in a proposed construction program. <br />This approach does not accurately portray the onsite conditions <br />within the Uncompahgre Project. Th~re is a significant <br />difference in the slope that exists from one end of the project <br />to the other which was apparently not accounted for in the <br />FR/FEIS. . '. <br /> <br />For this study, aerial photos '(1 inch = 200 feet scale, 2 <br />foot contour intervals) were used to determine required section <br />sizes for all of the canal systems. Along with the use of aerial <br />photos, extensive field work was completed to insure accurate <br />locations of canals and laterals. The decision was made to pipe <br />the laterals rather than line them because 1) maintenance on <br />pipe systems is significantly less than concrete-lined sections, <br />2) additional salt removal is recognized by placing pipe instead <br />of lining, and 3) the opportunities to reduce costs by reducing <br />the length of the laterals is significantly enhanced by using <br />underground pipe. <br /> <br />. <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.