Laserfiche WebLink
<br />, ,; .. <br /> <br />Construction Cost Estimate Prepsred by Grand Junction Projects Ollice <br />F88Sibllily Estimate lower Gunnison Basin Unit Group <br />Prices SS 01 October 1991 Fabruary 25, 1992 <br /> Quantity Unit Unit Cost Subtotals Totals <br />Latc~als-under the Gamet Canal <br />Land snd Righls <br />Rights 01 Way Aquisition 11 miles $200.lX) $2,200 $2,200 <br />Relocation of Property 01 Others <br />Farm Road Crossings 17 88 $500.00 $6,500 <br />County Road Crossings 8 88 $1,000,00 $6,000 $16,500 <br />Walerways <br />Concrete Pipe <br />12" 24602 K $10,84 $266,700 <br />IS" 14504 K $15,16 $219,900, <br />18" 9700 K $16,26 $ln,300 <br />21' 7500 K $19.63 $146.700 $812,600 <br />Pipe Plant - 6'Jl, Lump Sum Is $60,000 $60,000 <br />Waterway Structures <br />Pa'Hhall Flume Tumouts 62 ea $1,500,00 $123,000 $123,000 <br />Watarw&"/ Protective Works , 11 miles $2,000,00 $22 000 $22 000 <br /> Cost $1,036,300 <br /> 20% Contingencies $207 300 <br /> Subtotal $1,243,600 <br /> 14% Eng and OVerhead $174,100 <br /> Total Construction Cost $1 417 700 <br /> <br />~ <br />\ <br /> <br />. <br /> <br />~ <br />a:: <br />a:: <br />cx:' <br /> <br />. <br /> <br />;f <br /> <br />" <br /> <br />. <br />