Laserfiche WebLink
<br />"". . . ,. <br /> <br />. <br /> <br />Construction Cost Estimate Prepared by Grand Junction Projects Ollice <br />Feasibility Estimate Lower Gunnison Basin Unit Group <br />Prices as 01 October 199t February 25, 1992 <br /> Quantity Unit Unit Cost Subtotals Totals <br />South Canal <br />Land and Rights <br />Rights of Way Aquisition <br />Aquisition of land 18.59 acres $200,00 $3,700 <br />Documentation 7,67 miles $500,00 $3,800 $7,500 <br />Relocation 01 property of others <br />4 irrigation crossings and 1 gaging station <br />Excavation for structures 330 r:y $4,00 $1,300 <br />Backfill about structures 300 cy $2,00 $600 <br />Compacling backfill 150 cy $6,00 $900 <br />Coarse gravel 22 cy $21,00 $500 <br />Concrete 11 r:y $183,00 $2,000 <br />Cement 17 bbl $17,00 $300 <br />Reinforcement steel 1090 Ib $O,SO $500 <br />Welded steel pipe: <br />12-inch diameter, 7 gage 41 n 542,00 $1,700 <br />18-inch diameter, 3 gage 135 n $58.00 $7,800 <br />Corrugated metal pipe <br />12-inch diameter 48 n $10,00 $500 <br />18-inch diameter lSO n $15.00 $2,300 <br />Gaging Station Lump Sum Is $5,400 <br />Unlisted Items Lump sum Is $2,700 $26,SOO <br />Structures and Improvements <br />Stock fencing 80995,2 n $2,SO $202,500 $202,500 <br />Road Construction/Gravel 7,67 miles $14,000.00 $107,400 $107,400 <br />Waterways <br />PVC Lining <br />Construction of 1060 cfs canal reach 40497,6 n $183,00 $7,411,100 $7,411,100 <br />Waterway Structures <br />Parshall Flumes 14 ea $2,500.00 $35,000 $35,000 <br />Waterway Protective Works <br />17 culverts, improvement of <br />existing drains <br />Excavation for existing drain improvement 30000 r:y $2,00 $60,000 <br />Excavation for structures 24100 cy $4.00 $96,400 <br />Backfill around structures 19500 r:y $2,00 $39,000 <br />Compacting backfill 19500 r:y $6,00 $117,000 <br />Aiprap 1100 r:y $16,00 $17,600 <br />Sand and gravel bedding 570 r:y $14,00 $8,000 <br />Coarse gravel 30 r:y $16.00 $500 <br />Concrete 1550 r:y $180,00 $279,000 <br />Cement 2330 bbl $16,00 $37,300 <br />Reinforcement steel 151600 Ib $O.SO $75,800 <br />Pipe designated by sumbol as follows: <br />24C25 390 n $35,00 $13,700 <br />30C25 130 n $47,00 $6,100 <br />38C25 130 n $61.00 $7,900 <br />36025 370 n $65,00 $24,100 <br />48C25 260 n $94,00 $24,400 <br />Unlisted items Lump sum Is $121 000 $928,000 <br /> Cost $8,718,000 <br /> 20% Contingencies $1,743 600 <br /> Subtotal $10,461,600 <br /> 14% Eng and Overhead $1,464,600 <br /> Total Construction Cost $11,926.200 <br /> <br />. <br /> <br />.... <br />C1) <br />c;J <br />o <br /> <br />. <br />