My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04698
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04698
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:15:12 PM
Creation date
10/12/2006 12:31:57 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8273.100
Description
Colorado River Basin Salinity Control - Federal Agencies - Bureau of Reclamation
Basin
Colorado Mainstem
Water Division
5
Date
5/22/1992
Author
BOR
Title
Uncompahgre Project SO-JU Study
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />. <br /> <br />~ <br />en <br />~ <br />00 <br /> <br />. <br /> <br />. <br /> <br />nine laterals total 11 miles in length and would have capacities ranging from <br />15 to 5 cubic feet/second, The locations of the laterals are shown on Drawing <br />No, 1244-417-1415, <br /> <br />F. Structures <br /> <br />Each lateral would originate from a gated turnout at the bank of the <br />canal which will have 'a, parshall ,flume and a stilling pool, except for Cedar <br />Creek lateral which originates at'the bank ,of Cedar Creek and the AMH <br />sublateral which originates at'the bank'of Cedar Creek, Each turnout would <br />include a concrete transition at the .outlet.of the turnout pipe. From the <br />turnout each lateral would be'a'piped gravity system, Each turnout from the <br />lateral will be a parshall flume turnout. 'Both'sublateral turnouts and farm <br />turnout's would include .concrete transitions .at the outlet of the turnout <br />pipes, <br /> <br />G. Cross-Draina~e Facilities <br /> <br />Cross-drainage interceptor ditches would not be required on any project <br />laterals. The old lateral alignments will remain open as appropriate to act <br />as interceptor ditches. <br /> <br />39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.