Laserfiche WebLink
<br />',' <br /> <br />VI, Laterals <br /> <br />. <br /> <br />Each lateral was designated with the letter prefix of the canal which <br />it is under, followed by either a mile station or another letter symbol, <br /> <br />.... <br />Cj) <br />CJl <br />-J <br /> <br />-- A. South Canal Laterals <br /> <br />There are seven existing laterals under the South Canal, AB, AC, Al.5, <br />AH, AG, AM and Cedar Creek Lateral, which would be piped with either concrete <br />or PVC pipe, The capacities range from 70 to 2 cubic feet/second and the total <br />'length will be 60 miles. This includes a combination of AM lateral that will <br />result in a 3 mile reduction in length for AM Lateral, <br /> <br />Several changes will be made to the alignments which will result in <br />~reduction of length of laterals as well as more efficient water delivery, For <br />example, the map on page (not vet complete) shows the proposed alignments for <br />some of the laterals, AM lateral will be modified to take out of the South <br />Canal in 5 different locations and use small pipes to make the deliveries now <br />carried' by AM Lateral, This re-alignment will result in the reduction of 3 <br />miles of lateral as well as provide the water users with additional head by <br />ta\,ing Water directly out of the South Canal. AMA will be relocated as shown <br />on this map. <br /> <br />B, Loutzenhizer Canal Laterals <br /> <br />There eleven existing laterals under the Loutzenhizer Canal, Dl.58, Dl,60, . <br />,D4,30, D6,40, DA, DB, DC, DE, DF, DG, and DK, which would be placed in <br />concrete or PVC pipe. The 11 laterals total 25 miles in length and would have <br />capacities ranging from 85 to 2 cubic feet/second, The locations of the <br />laterals are shown on Drawing No. 1244-417-1414, <br /> <br />C, Selig Canal Laterals <br /> <br />There are 11 existing laterals under the Selig Canal, EC, ED, EF, EE, <br />EH, EJ, ,EK" EL, EM, EO, ED which would be placed in concrete or PVC pipe. <br />Modifying EO lateral by adding 3 siphons as indicated on the map on page (Not <br />vet comolete) will result in being able to completely eliminate EQ lateral. <br />Total length of the remaining laterals will be approximately 35 miles. <br /> <br />D, East Canal Laterals <br /> <br />There are six existing laterals under the East Canal, GB, GD, GE, GF, <br />GH, AND GK, which would be placed in concrete or PVC pipe. The six laterals <br />total 47 miles in length and would have capacities ranging from 85 to 4 cubic <br />feet/second, The locations of the East Canal laterals are shown on Drawing <br />No, 1244-417-1416, <br /> <br />E, Garnet Canal Laterals <br /> <br />There are nine existing laterals under the Garnet Canal, HA, HB, HC, <br />HD, HE, HF, HG, HH, AND HI, which would be place in concrete or PVC pipe, The ~ <br /> <br />38 <br />