Laserfiche WebLink
<br />..... <br />0') <br />CJl <br />'-', <br /> <br />C. Structures <br /> <br />Structures to be constructed along the canal would include 1 irrigation <br />crossing, 48 parshall flume turnouts, 6 cross-drainage culverts, 6 co~nty road <br />crossings, 7 farm road crossings, 12 check drops, 3 rectangular. inclined <br />drops, and 3 drain inlets. Property to be relocated includes one waterline <br />crossing, <br /> <br />D, Safety features <br /> <br />The entire canal would be fenced on both sides, <br /> <br />E. Cross-drainage facilities <br /> <br />Culverts to handle floods would be replaced in kind, This is <br />approximately 6 culverts. <br /> <br />36 <br /> <br />. <br /> <br />. <br /> <br />. <br />