My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP04698
CWCB
>
Water Supply Protection
>
Backfile
>
4001-5000
>
WSP04698
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:15:12 PM
Creation date
10/12/2006 12:31:57 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8273.100
Description
Colorado River Basin Salinity Control - Federal Agencies - Bureau of Reclamation
Basin
Colorado Mainstem
Water Division
5
Date
5/22/1992
Author
BOR
Title
Uncompahgre Project SO-JU Study
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />...... <br />C') <br />..':::.. <br />1\.:' <br /> <br />. <br /> <br />. <br /> <br />APPENDIX A <br />PROPOSED SCHEDULE FOR REMAINING STUDY ACTIVITIES <br /> <br />Activitv <br /> <br />Regional Ofe. coordination meeting <br /> <br />Begin EA preparation <br /> <br />Distribute Status Report to UVWUA & <br />Forum Work Group <br /> <br />Discussions with UVWUA, Forum <br /> <br />Furnish prelim. recommended plan to F&WS <br /> <br />Public Meeting (timing @ discretion of UVWUA) <br />Draft F&WS Coordination Act Report <br />Draft Mitigation Plan <br /> <br />Complete draft SO(JU Study Report(EA <br /> <br />Region/ACRM Review <br /> <br />Draft report(EA to public/agencies <br /> <br />End of public review period <br /> <br />Final Coordination Act Report <br /> <br />Include funding in UC preliminary FY95 budget <br /> <br />Revise and finalize report/EA <br />Final approval of report(EA <br /> <br />Distribute final reportjEA <br /> <br />Include in UC budget documents <br /> <br />Negotiate O&M contract <br /> <br />Inclusion in Salinity Forum's Recommended Plan <br /> <br />UVWUA vote on participation in project <br /> <br />Inclusion in President's proposed budget <br /> <br />Approval of R&B funding in 95 budget (if needed) <br /> <br />Approval of salinity funding in FY95 budget <br /> <br />Begin construction <br /> <br />23 <br /> <br />Target Com- <br />oletion Date <br /> <br />6/4/92 <br />6/5 <br /> <br />6/8 <br />7/1 <br />7/1 <br /> <br />? <br /> <br />7/31 <br />8/15 <br />9(15 <br />lD/15 <br />11/15 <br />12/15 <br />1/15/93 <br />2(? (9 3 <br />2/28/93 <br />3/15/93 <br />4(1(93 <br />5/93 <br />6/93 <br />7/93 <br />11/93 <br />1(94 <br />9/94 <br />9/94 <br />10(94 <br /> <br />Responsi- <br />bilitv <br /> <br />GJ-700M <br /> <br />GJ-150 <br /> <br />'GJ-700M <br /> <br />GJ-700M <br /> <br />GJ-150 <br /> <br />GJ-700M <br /> <br />F&WS <br /> <br />GJ-150 <br /> <br />GJ-700M/150 <br />UC/ACRM <br />GJ-700M <br /> <br />F&WS <br /> <br />UC-700 <br /> <br />GJPO/ACRM <br />ACRM/UC <br /> <br />ACRM <br /> <br />UC-700 <br /> <br />GJ-400 <br /> <br />Forum <br /> <br />UVWUA <br /> <br />W-1000 <br /> <br />Congress <br /> <br />Congress <br /> <br />UVWUA <br />
The URL can be used to link to this page
Your browser does not support the video tag.