Laserfiche WebLink
<br />. <br /> <br />C. Construction Costs <br /> <br />Table 1 displays a summary of the total construction cost <br />for each component including a 20% contingency and a 14% <br />engineering and overhead allowance. More detailed plan <br />~ information and cost estimates for each canal and lateral <br />en component is contained in Appendix B. <br />C.1J <br />C) <br /> <br />TABLE 1 <br />construction Costs <br /> <br />Component <br /> <br />Construction Cost <br /> <br />Canals: <br /> <br />South <br />Lout zenh-i:;: er <br />Selig <br />East <br />Garnet <br /> <br />$11,926,000 <br />9,196,000 <br />12,600,000 <br />6,942,000 <br />5,773,000 <br /> <br />$46,437,000 <br /> <br />Subtotal' <br />~ Lateral Systems: <br /> <br />. <br /> <br />South <br />Loutzenhizer <br />Selig <br />East <br />Garnet <br /> <br />$10,946,000 <br />5,510,000 <br />8,167,000 <br />12,093,000 <br />1,418,000 <br /> <br />Subtotal <br /> <br />$38,134,000 <br /> <br />TOTAL <br /> <br />$84,571,000 <br /> <br />11 <br />