Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />o <br />':") <br />W <br />~ <br />CJ" <br />c.c <br /> <br />The estimated stream depletion for the 18 year study <br />period affiounted to 32,300 acre feet. This depletion is 19.6% <br />of the subbasin undepleted runoff and somewhat higher than the <br />percentage water supply depletion of any of the other subbasins. <br />Figures showing the undepleted water yield of the subbasin is <br />given in the following table: <br />Undepleted Plateau Creek Subbasin Runoff <br />Average for 1$ Year Period 1943-1960 - Units Acre Feet <br /> <br />Runoff of Plateau Creek <br />Stream Depletion <br />Net Undepleted Subbasin Water Supply <br /> <br />Present Water Use <br /> <br />132,500 <br />32,~00 <br />164, 00 <br /> <br />The Bureau of Reclaffiation reported 26,300 acres of <br />land irrigated in the Plateau Creek Subbasin in 1939. In <br />1960 or prior to use of Collbran Project water, the irrigated <br />land amounted to 29,100 acres" This is an increase of 10.6% <br />over that irrigated in 1939. Of the total area of 29,100 <br />acres irrigated in 1960, less than 10,000 acres received a <br />full irrigation water supply. The annual stream depletion <br />is estimated to be 29,800 acre feet. <br />The population of the subbasin in 1960 was 1,569. <br /> <br />Census figures show a loss of 546 persons or 26j~ fer the 30 <br /> <br />year period 1930-1960. The \!ater used fer r.:unicipal and <br /> <br />donestic purposes would net exceed 400 to 500 acre feet a <br /> <br />year \lith the strear:. depletion fer these purposes lirdted <br /> <br />to less than 200 acre feet" The strear.. depletion for r,mni- <br /> <br />ci,pal. and don:estic use tozether with reservoir evaporation is <br /> <br />33 <br />