Laserfiche WebLink
<br />~' water development projects be completed before control measures are <br />00 <br />~ identified or brought on line, temporary increases above the criteria <br />~ <br />could result and these increases will be in conformanee with the <br /> <br />regulation. With completion of control projects, those now in the <br /> <br /> <br />plan or those to be added subsequently, salinity would return to <br /> <br /> <br />or below the eriteria level. <br /> <br />Periodic increases above the criteria as a result of reservoir <br /> <br />conditions or periods of below long-time average. annual river flow <br />also will be in conformance with .the regulation. With satisfactory <br />reservoir conditions and when river flows return to the long-time <br />average annual flow or above, concentrations are expected to be <br />at or below 1Pe criteria level. <br /> <br />" <br /> <br />. , <br /> <br />-iii- <br /> <br />'-~~---'----------- - <br /> <br />...i..-... <br />